Before removing an internal wall in an apartment in Greece, get a civil engineer to check whether the wall is part of the structure. Compare the layout with the approved plans and agree in writing what approval you need. Joining your flat to the one next door is a separate case, covered in merging two apartments in Greece, and so is splitting an apartment into two. Then find out what pipes or wires run inside the wall, and make sure quotes include fixing the floor, ceiling and surrounding walls, not just knocking the wall down.
Key takeaways
- An engineer, not the contractor, should decide whether a wall can come out and which approval route applies.
- Check the approved floor plan first, and resolve any existing difference before adding changes.
- Most internal walls hide pipes, cables or a radiator that must be rerouted or capped properly.
- The gap the wall leaves in the floor and ceiling is often the hardest and costliest part to get right.
- A good quote lists engineering, approvals, protection, services, reinstatement and finishing as separate lines.
Why is going open plan so popular in Greek apartments?
A lot of apartments in Athens built from the 1960s to the 1990s have a closed-off kitchen, a separate dining room and a long hallway. Owners renovating today want a big, bright space, especially in a small apartment, and removing one wall in a Greek apartment usually does most of that work.
In a typical reinforced-concrete polykatoikia, you’ll often find internal walls made of brick that don’t actually hold anything up. But what looks like a simple wall can be hiding something important, like a column, a beam, a section of concrete wall or a bundle of pipes and cables. That’s why it’s important to do the checks in the right order, rather than rushing into demolition.
Is the wall load-bearing? Start with an engineer’s assessment
A civil engineer should look at the wall first, not the person who’s going to tear it down. In a concrete-frame building, the structure is the columns, beams, slabs and any concrete wall sections. The brick infill between them isn’t meant to be structure, but it still affects how the building behaves. Greece’s official guidance for pre-earthquake inspection of buildings even considers the layout of infill walls in its assessment. In older masonry buildings, internal walls may genuinely carry the floors above.
An engineer will inspect the wall, review the building’s plans if they are available and open small test points if needed. They will then tell you in writing whether the wall can come out as it is, needs a new beam or extra support, or is best left alone.
If the structure is involved, everything changes: the price, the approval route and whether you need the consent of the other owners. The parts that hold the building up belong to the building as a whole, not just to your apartment.
Do the approved plans match what is there today?
Before planning anything new, check the current layout against the floor plan attached to the building permit. Our guide to building regulations in Greece and the 2026 planning code explains which rules apply to an existing home. In Greece, previous owners often moved a wall, closed a balcony or merged two rooms without approval. If your apartment already looks different from what’s on the permit, more changes can make the paperwork harder, not easier. Your engineer can tell you whether an earlier change needs dealing with first.
Which approval does removing an internal wall in an apartment in Greece need?
Taking down a wall isn’t automatically “minor works”. Depending on what’s involved, you might just need an engineer’s certificate, or you might need small-scale works approval. Under the rules for small-scale works approval, interior rearrangements are covered only if they don’t affect the building’s load-bearing structure. The engineer has to make a formal declaration confirming this and include a floor plan with the application. If the work affects parts of the building the owners share, like the load-bearing structure, you’ll need the co-owners’ consent too. And if you’re doing any major structural work, you’ll usually need a full building permit.
Our guide on whether you need a permit to renovate an apartment in Greece breaks down the three routes you can take, the €25,000 budget rule and what the engineer’s role is all about. Get the engineer’s view on the route in writing, and don’t let anyone start until the approval is in place. Once the renovation is complete, it’s also a good idea to check with the engineer whether the building’s Electronic Building Identity needs to be updated, and to use our renovation handover checklist before the final payment.
What is hidden inside the wall?
In Greek apartments, the inside walls are often where the plumbing and wiring are hidden. Before any quote is final, map what runs through the wall you want to remove. You might find things like:
- Electrical cables and sockets. Switches, sockets, the internet point and sometimes the feed to another room.
- Water and drainage pipes. Especially in walls next to the kitchen or bathroom, which matters even more if you are also moving a kitchen or bathroom.
- Heating pipes and radiators. In buildings with central heating, the pipes to your radiators may run inside the wall, and a radiator mounted on it will need a new place.
- Shared risers. Vertical pipes or ducts serving the whole building sometimes pass through an apartment. These are common parts and cannot simply be moved.
- Gas pipes and air-conditioning lines. Both need a qualified installer to reroute them.
Electrical work needs particular care. HEDNO, the electricity distribution operator, says in its guidance on electrical safety at home that if an existing electrical installation is modified, a qualified electrician has to inspect it. The findings go into the installer’s declaration, the YDE, which the owner also signs.
“Before any wall comes down, I ask for three things in writing: the engineer’s opinion, a drawing of what runs inside the wall, and a quote that shows how the floor and ceiling will be finished. Owners worry about the demolition, but the real cost is in the gap the wall leaves behind. If the floor reinstatement isn’t priced, it will appear later as an extra.”
– Yanis Zisis, Founder of Home Watch Athens
The floor and ceiling: what happens after the wall comes out?
A removed wall leaves a bare strip on the floor with no tiles, marble or wood, because the flooring was laid around it. You’ll also see a matching strip on the ceiling and a line on the side walls where plaster and paint stop.
Floors
Finding a match for an old floor can be tough. If you’re looking for marble from the 1970s or 1980s, it’s hard to find the same colour and vein, and old tiles might not be made any more. The two rooms may also have different floors or levels. Your best options are:
- A patch with salvaged or closely matched material, accepting that it may show
- A deliberate threshold strip in a contrasting material
- A new floor across the whole open-plan space, which often gives the best result
Ceilings and walls
Taking out a partition can reveal a beam that has to stay. It can be boxed in or hidden behind a plasterboard ceiling. The ceiling and surrounding walls will need plastering and repainting, and the lights may need moving. If the flat is an older one, our guide to renovating an old apartment in Athens covers what tends to be hiding behind the walls.
What should the quote include?
Ask for an itemised quote, with each of these as a separate line:
| Item | What to check |
|---|---|
| Engineering | Assessment, drawings, approval filing and any supervision |
| Protection | Covering floors, doors and the common stairwell during works |
| Demolition and rubble | Removal of the wall and taking the rubble away |
| Services | Rerouting or capping cables, pipes, radiators and gas |
| Floor | Patch, threshold or new floor, and the material chosen |
| Ceiling and walls | Plastering, any beam boxing, repainting |
| Electrical certification | Inspection and a new YDE if wiring changes |
As a guide, renovation works start from €600/m², excluding 24% Greek Tax. Contractor quotes in Greece often end up higher than first quoted, mostly because some costs were never priced.
How Home Watch Athens can help
We carry out renovations ourselves as well as overseeing them, so even if you’re not in the country, your open-plan project can be run from beginning to end. We work with an engineer on the structural check and approvals, map the services before quoting, and give you a written, itemised quote that includes reinstating the floor and ceiling. You’ll get photos on WhatsApp throughout, including before surfaces are closed up. Find out more about our renovation company in Athens, or Apply for Membership and Yanis will reply within 24 hours.
Frequently asked questions
Can I remove an internal wall in my Greek apartment without an engineer?
It is not advisable. Even a wall that seems to carry nothing can sit next to a column or beam, and only an engineer can confirm what it is. The engineer is also the person who files any certificate or approval the work needs. Starting without one risks both the building’s structure and problems with your paperwork later, for example when you come to sell.
How do I know if a wall is load-bearing?
You can’t tell reliably by knocking on it. In concrete-frame buildings, partitions are often non-structural brick, but concrete wall sections, beams and columns can be hidden behind plaster. In older masonry buildings, the internal walls may carry the floors above. An engineer will check the drawings, inspect the wall and, if needed, open small test points before giving a written opinion.
Do I need my neighbours’ permission to remove a wall?
Not usually, if the wall is a partition inside your own apartment that affects nothing shared. If the work touches the load-bearing structure or other common parts, such as a shared riser, the consent of the co-owners is required. Even when no consent is needed, letting the building manager and neighbours know in advance helps the work go smoothly.
How long does removing an internal wall take?
The demolition itself can take a day or two. The full job takes longer: the engineer’s assessment and any approval come first, then the work on services, floor, ceiling and paint. For a simple partition with a straightforward floor repair, a few weeks from start of works is realistic. A new floor across the open space or structural work will extend this.
Will the floor show where the wall used to be?
Often, yes, unless you plan for it. Older marble and tiles are hard to match, so a patch can stand out. Many owners choose either a deliberate threshold strip or a new floor across the whole open-plan area. Decide this before the quote is final, as it is one of the biggest cost differences between quotes.
This guide is general information, not legal advice. Which approval your works need depends on your property and its status, so always get a written opinion from a qualified engineer and, for your own situation, you can consult a lawyer.