Last reviewed: November 2026

Exterior house painting in Greece is not just about applying paint. It’s about all the work that happens before that. For the paint job to last, you need to fix any cracks, loose render, rusting steel and damp first. You also need a coating that can handle strong sun and salty air, and mild, dry weather, which in Attica means spring or autumn. If you’re using scaffolding, an engineer files a small-scale works approval. And if the scaffolding takes up space on the pavement, you’ll need the municipality’s permit for the use of public space too.

Key takeaways

  • Repairs come first: cracks, hollow render, rusting reinforcement and damp.
  • A paint system is a primer plus finish coats, chosen for sun, rain and, near the coast, salt.
  • Painting with scaffolding needs a small-scale building works approval, and occupying the pavement or road for the works needs a permit from the municipality.
  • Spring and autumn give the mild, dry days that coatings need.
  • On a maisonette or shared plot, agree the work with the co-owner in writing first.

Why is the paint the last step?

When you repaint a house exterior in Greece, remember that paint is a thin layer of protection. It keeps sound render safe, but it can’t hold loose render on the wall, close a crack that is still moving or stop rust under the surface. If you paint over these faults, the new paint will look nice at first, but soon it fails in the same places.

What has to be repaired before any paint goes on?

Cracks

Hairline cracks in the render are usually dealt with by slightly opening them up, filling them with a flexible exterior filler, and then priming them. Wider cracks, the diagonal ones that appear at the corners of windows, and cracks that keep reopening after being filled are a different story. Those are a structural concern, and an engineer looks at them before any scaffolding goes up.

Blown render

When you tap on the render that’s come loose from the wall, it sounds hollow. To fix it, the crew cuts it back to a solid edge and then builds up new render in layers. The new render needs time to cure before you can paint it, and the product data sheet will tell you how long to wait.

Rusting steel

If you notice brown stains or cracks along the edge of a balcony, or pieces of concrete breaking off, the reinforcement inside is rusting. To fix this, the loose concrete has to be removed, the steel cleaned and treated, and then the section is rebuilt using repair mortar, all under the guidance of an engineer. This is common in homes near the sea, and our post on specifying a seaside home for salt and humidity explains why the base matters more than the finish.

Damp

If rain is getting into a wall through cracks or around the windows, the wall has to be made watertight and left to dry before a new coat goes on it. We have a guide to rain getting through external walls and how it is fixed, covering each cause step by step.

Which paint systems cope with Greek sun and sea air?

You need a paint system that works together. This means a primer that’s right for the surface, and then the finish coats that are designed to go with it. The data sheet for each product tells you what surfaces it’s suitable for, how many coats to apply, and how thick each coat should be. It also gives the wait between coats and the temperature range. So ask for the data sheets with the offer.

System, in plain words What it does Where it fits
Exterior acrylic masonry paint over a stabilising primer Sheds rain, resists strong sunlight, and the primer binds an old, powdery surface Sound render in good condition
Elastic (elastomeric) facade coating Stretches over fine cracks so rain cannot enter them Render with a network of hairline cracks, and walls facing the weather
Silicone-resin or mineral (silicate) paint Repels rain while letting water vapour out of the wall Older masonry and walls that have had damp

If you have a house by the sea, you need to rinse the walls with fresh water before you put primer on them. This is because any salt left on the walls will keep the primer from sticking properly. When painting a coastal house, the exterior paint will only work right if the surface is clean, dry, and free of salt. Also, make sure each coat is as thick as it says on the data sheet.

Which approvals does exterior painting need?

Scaffolding and the small-scale works approval

For jobs like painting the outside of a building, fixing render, or repairing the facade using scaffolding, the national registry of procedures lists an approval called a small-scale building works approval (Έγκριση Εργασιών Δόμησης Μικρής Κλίμακας). Putting up scaffolding is on the same list in its own right. An engineer submits the application online through the Technical Chamber’s e-Adeies system. Once the file is in, the approval is issued right away. It’s valid for one year, and it can be extended for one more. The documents are listed in the small-scale building works approval procedure on mitos.gov.gr.

Scaffolding on the pavement

Anyone doing technical or construction work may need to occupy part of the pavement or road, which is the position when scaffolding stands there. To do this, they need the municipality’s licence for the use of public space. The application goes to the municipality and says where the space is, how much of it is needed, what kind of use it is, and for how long. The mayor issues the permit, but first the municipal charge is paid to the municipal treasury, before the permit is handed over. The steps are on the licence for the use of public spaces page. If you want to know who usually applies, see our other post about municipal permits for scaffolding and skips.

Protected areas and listed buildings

In traditional settlements, traditional parts of towns, areas of natural beauty, archaeological sites and historic sites, the rules are more strict. There the approval is compulsory, even if you’re not using scaffolding, and drawings of the facades are filed with it. The only exception is if the engineer’s technical report shows you’re using exactly the same material and type as the existing construction. Then the approval is needed only with scaffolding, without facade drawings. For listed buildings, the facade drawings are filed in every case. Sometimes the file also carries the approvals of bodies like the Ministry of Culture or the Architecture Council, depending on the rules for that area or building.

When is the right season to paint outside?

For painting outside, the best time is spring or autumn. This is because fillers, render, and coatings cure best when the air is mild and dry, and the wall is dry too. In an Attica summer, the sun can make a wall very hot, which causes the paint to dry on the surface before it’s had a chance to bond properly. Winter is not great either, because rain stops the work and the walls stay damp for days.

Plan ahead. The approval, the scaffolding and the repairs all come before the first coat. For painting the outside of a house in Athens, an early autumn start lets you finish before the wetter months arrive.

A maisonette or shared plot: agreeing with the co-owner

In a lot of cases, maisonettes are part of a group of homes that share a single plot of land, connected by a common wall. The facades are then typically shared parts under the deed that establishes ownership. So, if any work needs to be done on these shared parts, the approval file must include agreement from the other owners. This agreement can be proven by any lawful means, such as through signed statements with certified signatures or the minutes from a meeting of the owners.

It’s a good idea to get the basics down in writing at the same time: things like which walls are part of the job, where the scaffolding will go, the dates, and who’s in charge of what. Our post on how a house or maisonette project differs from an apartment explains what other things are typically shared in these kinds of setups.

How do you oversee an exterior repaint from abroad?

Divide the work into smaller parts and get photos with dates on them after each part is done, but before moving on to the next one:

  • the approval and any municipal permit, before the scaffolding arrives;
  • the walls after washing and tapping, with cracks and hollow areas marked;
  • the repairs opened up: cut-back render, cleaned steel, filled cracks;
  • the primed walls, with the product labels in the picture;
  • the first coat and the finished walls.

Link every payment to a specific part of the project that you can see. For members, this is all part of how we keep an eye on things through our renovation oversight for owners abroad. So, before each stage is covered up, we take photos and send them to you.

“Ask for a photo of every repair while it is still open, before the primer. Once a wall is painted, a good repair and a skipped one look identical. The difference shows a winter or two later, and by then the scaffolding is long gone.”

Yanis Zisis, Founder, Home Watch Athens

Keeping an eye on the house afterwards

Finding a hairline crack in a wall early on keeps it a minor touch-up, not a whole new paint job. Our members receive a monthly home visit by Yanis, with a photo update. Repairs and contractors are arranged as member services, quoted separately. If you’re interested in this for your home in Athens or Attica, Apply for Membership.

Frequently asked questions

Do I need a permit to paint the outside of my house in Greece?

If the work uses scaffolding, yes: exterior painting with scaffolding is on the list of works that need a small-scale building works approval, which an engineer files electronically. In traditional settlements and other protected areas it can be compulsory even without scaffolding. Scaffolding that occupies the pavement also needs the municipality’s permit for the use of public space.

What is the best time of year to paint a house exterior in Athens?

Spring and autumn. Repairs and coatings need mild temperatures and dry walls to cure properly. In summer, sunlit walls get so hot that paint dries before it bonds, and in winter rain interrupts the work and leaves the masonry damp.

Can the painter simply paint over cracks and stains?

No. Fine cracks are opened, filled and primed first. Hollow render is cut out and replaced. Rust stains mean steel is corroding inside the concrete, which is repaired under an engineer’s instructions. Damp patches need the water entry fixed and the wall dried. Paint applied over any of these fails along the same lines.

My maisonette shares a plot. Can I repaint only my side?

Where the facades are shared parts under the ownership deed, work on them needs the other owners’ consent, shown for example by signed statements with certified signatures or by the minutes of an owners’ meeting, and that consent goes into the approval file.