When people own homes in Greece but live elsewhere, things can go wrong with renovations, especially before the work begins or when no one independent is around to keep an eye on things. The problems often start with a scope that’s not clear, or when money is paid before the work is done, and sometimes pipes are covered up without being checked first. These are the renovation mistakes Greece sees again and again from owners abroad, and they can be avoided if you know what to watch out for at each stage of the project.
Key takeaways
- Most problems are fixed on paper before the first day: a written scope, the right approval route and a building that knows what is coming.
- During the works, the risky moments are payments, phone decisions and anything about to disappear behind tiles or plaster.
- Hold the last payment until the snags are fixed and the documents are in your hands.
Why do renovating from abroad mistakes happen so easily?
Living in the same city as your renovation project, you can drop by on your way home and notice things like the wrong boxes in the hallway or an unusual silence for two days. But when you’re abroad, you’re limited to what you are sent. And the contractor is not only doing the work, but also reporting on it. This is why the same renovation mistakes happen over and over. They come down to what was written down, who checked it, and when the payments were made.
Mistakes made before work starts
1. Starting without a written scope
A quote that just says “bathroom renovation” isn’t a scope of work. The document should spell out, room by room, what will be removed, what will be installed, and who will supply the materials. If this isn’t clearly laid out, any dispute down the line is just your word against the contractor’s. Ask for a separate document that outlines the scope of work, attached to the signed agreement, before you discuss a start date. For the rest of the agreement, our guide covers how to vet a contractor and what the contract should contain.
2. Agreeing the job before anyone has looked behind the finishes
On a first visit to an older apartment, a contractor only sees the surface. If you sign an agreement based on that, it is likely to be rewritten when the demolition starts. Ask for a few tiles to be lifted and the electrical panel to be opened before you sign anything, so the scope reflects what’s really there. Our separate guide explains what usually hides behind the walls of an older Athens apartment.
3. Not checking what is legal
“We do this all the time” doesn’t mean the work is approved. Greek building law sorts works into three groups. Some works are fine without any permit, others need a small-scale works approval, and some need a full building permit. The small-scale works approval is filed online by an engineer and is good for one year from the day it is issued. If the work affects parts of the building that everyone shares, like the facade or the structure, the other owners have to agree. The official procedure page for small-scale works approval lists what the file has to include. Before you agree a start date, get the route that applies to your job in writing.
4. Starting without the building being told
Before you start a renovation, let the building know what’s going on. A simple written note to the building administrator, with the dates and times of the work and a phone number, prevents most complaints. Noisy work also has to stay outside the quiet hours published by the Hellenic Police, which are from 15:30 to 17:30 and again from 22:00 to 07:30 in the winter, and from 15:00 to 17:30 and from 23:00 to 07:00 in the summer. The building’s own regulation can have even stricter rules.
Mistakes made while the work is under way
5. Paying ahead of progress
When the money is paid before the work is done, nobody hurries back to the job. A picture from the contractor only shows one moment from one viewpoint, not the whole finished stage. Link each payment to a stage that’s listed in the agreement. Before you transfer the money, have someone other than the contractor go to the site and confirm that the stage is complete.
6. Making decisions by phone with no record
A quick call from the site seems to get things done. But three weeks down the line, nobody agrees about the socket position or the door that was picked. After each call, send a brief follow-up message that repeats what was decided and asks the others to respond with a simple “agreed”. Keep all the conversation in one thread.
7. Letting hidden work be covered before anyone checks it
The new pipes, waste connections, shower waterproofing and cable runs are only visible for a few days. Then they get covered up with tiles and plaster. Set a simple rule: nothing gets closed up until someone has seen it, tested it with water where water runs through it, and taken a photo with a tape measure in the picture. These checks are called hold points, and they should be written into the programme before the job starts.
8. Agreeing changes verbally
When someone on site says “while we are here, shall we also do the corridor?” it seems harmless. But every change affects how much you end up owing and when the job will be finished. A spoken yes records neither. Nothing changes until it’s in writing, with both effects spelled out: the amount and the finish date. Our guide to agreeing changes and avoiding delays before work starts sets out a simple approval record.
Timing mistakes: August, deliveries and your own arrival
9. Forgetting August
A programme that’s supposed to run through mid-August often comes to a halt in practice, because a lot of workshops and suppliers close for part of the month. Get the closing dates in writing from each trade and supplier, and place your orders so that nothing important is due to arrive during that time.
10. Deliveries with nobody to receive them
When deliveries of tiles, sanitaryware and kitchen units arrive, the crew is often not around. Someone needs to be there to let the driver in, count the boxes against the order and verify that all the tile boxes have the same batch number. They also photograph any damage before the driver leaves.
11. Arriving to find it unfinished
When you’re planning to travel, it’s tempting to book your flights for the date the work is promised to be finished, and that is how owners arrive to dust. Leave a few weeks between when everything is due to be done and when you arrive. Also arrange an independent visit about a month before your trip. This visit tells you whether to stick with your travel plans or move them.
“The days that matter most on a renovation are the ones just before something gets covered up. When I visit a member’s flat during works, I go on the day the pipes are in and the tiles are not, I run water through everything and I photograph every wall with a tape measure in the picture. If I could make only one visit in the whole job, it would be that one.”
Yanis Zisis, Founder, Home Watch Athens
Mistakes made at the end of the job
12. Making the final payment before snagging
When a contractor comes back to fix a sticking door, it’s usually because the last instalment is still unpaid. So before you pay it, do a thorough walk-through of the place, or have someone do it for you. Check everything that runs, drains or opens, and make a list of any issues you find, with photos. Don’t make the final payment until everything on the list has been taken care of. We have a room-by-room handover checklist for the final inspection that covers what to test.
13. Leaving without the documents
Getting all the paperwork while the team is still on site is a lot easier than trying to track it down later. This includes things like invoices, warranties and manuals. There’s also the electrician’s installer declaration, called the YDE, which is a digital document that the electrician who did the work prepares and posts online. Make all of these documents a written condition of the final stage of the project, along with fixing any snags.
14. Not updating your own records
When you’re renovating, things get moved around. Before the job is closed, file a record of what’s been done: photos of the work that’s hidden from view, a diagram of the panel with labels, the location of all the shut-off valves, and the product references for tiles and fittings. If an engineer’s approval was issued, keep a copy of that file too. This way, the next plumber won’t have to guess where everything is.
How do you avoid these mistakes renovating an apartment in Athens from abroad?
Mistakes on the list fall into two categories: things that were never written down, or times when no one independent was in the flat to see what happened. You can take care of the first type from any location. However, the second type requires someone in Athens who isn’t employed by the contractor.
We’re here to help our members in a very hands-on way. Yanis visits each member’s home every month and sends a photo update. If a member is renovating their home, we have a separate service, our independent renovation oversight service in Athens. Yanis will be on site at the stages above, and the service is quoted separately for each project. If you want someone to keep an eye on things at your home, Apply for Membership and let us know what you’re planning.
Frequently asked questions
What is the most common renovation mistake owners abroad make in Greece?
Starting without a written scope. When the agreement is a single line and a total, every detail is settled later by phone, and the owner abroad has no record to point to. A room-by-room scope, attached to a signed agreement, removes most later arguments about what was included and when the job counts as finished.
Do I need to be in Greece during my renovation?
No, but someone independent of the contractor needs to be in the flat at a few fixed moments: before hidden work is covered, when stages are claimed as complete, when large deliveries arrive and at the final inspection. Between those moments, a written record of decisions and dated photos are enough to follow the job.
What should be checked before walls and floors are closed up?
New supply pipes should be filled and left under pressure so that leaks show, waste pipes should be run with water, and the shower waterproofing should be seen before any tile goes down. Cable and pipe routes should be photographed with a tape measure visible, so that their position can be found again years later.
Does a small-scale works approval expire?
Yes. A small-scale works approval in Greece is valid for one year from the date it is issued and can be extended. It is filed electronically by an engineer, and where the works affect common parts of the building the file includes the consent of the other owners.