When it comes to contractor liability for defects Greece has its own set of rules in the Civil Code. If a contractor does a poor job, they’re still responsible for hidden problems after the project is finished. How long they’re responsible depends on the type of work: if it’s a building or other fixed installation, it’s ten years from handover, but for other kinds of work, it’s six months. What you can control is keeping good records, having proof, and acting quickly if something goes wrong.
Key takeaways
- A snag is unfinished work; a defect (κακοτεχνία) is work done wrongly.
- Accepting the work can end liability for faults visible at handover, so inspect carefully.
- Put a defects period, a retention and the fittings’ warranties in writing before work starts.
- From abroad, notify the contractor in writing with dated photos, and get an independent engineer’s report if the defect is serious.
Snag, defect or damage: what counts as a κακοτεχνία?
| Type | What it looks like | Usual route |
| Snag | Unfinished or untidy items: a sticking door, paint on the tiles | A snag list before final payment |
| Defect (κακοτεχνία) | Work done wrongly or not as agreed: lifting tiles, damp behind new plaster | The contractor’s legal liability for the work |
| Damage | Harm from an event, such as a burst pipe flooding the flat below | Often insurance, plus the contractor if their work caused it |
You might not notice a κακοτεχνία in your renovation right away, but it can show up months later. This often happens after a wet winter or a hot summer. You might see cracks in the grout, a leak behind your new kitchen, or water collecting on your balcony. We have a separate guide that walks you through the handover checklist up to the final payment. This post picks up where that one leaves off. If you bought your new place from a developer, the process for dealing with any issues that come up is different, and we cover that in a different guide.
What does the Greek Civil Code say about a contractor’s liability?
Most renovation projects are a contract for work (σύμβαση έργου), where the contractor does the work and you pay the agreed fee. If the finished job has defects, the Civil Code gives you some choices. In short:
- Minor defects: you can ask the contractor to put them right within a reasonable time, where that is proportionate, or ask for a proportionate reduction of the fee.
- Serious defects: if the work is unusable or lacks qualities you agreed, you may be able to withdraw from the contract.
- Defects caused by the contractor’s fault: you may claim compensation instead.
- Defects you caused: if the problem comes from your own instructions, particularly ones the contractor objected to at the time, you lose these rights.
When you hire someone to do a job, there’s something important to keep in mind: acceptance. Once you accept the work, the person you hired is usually not responsible for any problems that a normal inspection would have found. But they are still responsible for any defects that show up later or for anything they tried to hide on purpose.
How long is the contractor responsible after a renovation?
The Civil Code has rules about how long owners have to make claims about defects in the work. There are two time limits for this, and they start when the work is finished and handed over.
| Type of work | Time limit for claims |
| A building or other fixed (immovable) installation | Ten years |
| Other work | Six months |
Figuring out which category a renovation project fits into is the harder part. For instance, a job like waterproofing or putting in new plumbing is very different from giving a room a fresh coat of paint. It depends on what was done. Don’t assume you have ten years: act sooner rather than later, so you don’t lose time going back and forth with messages. Your contract might also give you more protection than the law does, like a set period for fixing any defects that come up.
What should you agree in writing before work starts?
Most problems with defects are easier to resolve, or avoided, when the agreement is clear. It’s best to get these in writing:
- A defects period: a stated time after handover during which the contractor will return and fix defects at no charge.
- The specification: materials and finishes, so “not as agreed” can be shown.
- Retention, fittings’ warranties and a written handover: the handover checklist guide above covers these; put them in the contract from the start. Goods bought in the EU also carry a minimum two-year legal guarantee from delivery.
If you’re making structural, electrical or plumbing changes, like moving walls or updating the wiring, you might wonder who to hire. Our guide can help you figure out when an engineer, architect or interior designer is needed for a renovation. It breaks down what each person does.
How do you notify a contractor of a defect from abroad?
Distance makes owners hesitate. Act early and in order:
- Record it. Dated photos and videos, wide and close up. Note when it first appeared.
- Stop it getting worse. If the fix needs the water or power off again, our post on keeping electricity, water and gas running during a renovation covers the practical side.
- Write to the contractor. A dated email describing the defect, with photos and the contract clause, asking them to inspect and repair within a reasonable time.
- Get an independent view. For anything serious, ask an independent engineer for a short report on the cause.
- Do not let someone else fix it first. Outside an emergency, another tradesperson’s repair can remove the evidence.
If a defect means a neighbour’s flat gets damaged, insurance might come into it too. You can find more information about this in our guide to insurance during a renovation in Athens.
We offer a renovation oversight service in Athens where members can ask us to stop by, take pictures of the defect, and be present when the contractor arrives to inspect it, so everything is documented before any repair begins.
“Most contractors will come back if you ask clearly and early. Send one dated message with photos and the contract clause, and give them a fair chance to inspect. What damages an owner’s position is waiting six months, or letting a cousin’s plumber fix it before anyone has documented the cause.”
Yanis Zisis, Founder, Home Watch Athens
When should you escalate, and how?
Most defects are settled once the contractor sees the evidence. If not:
- A firm written follow-up setting a date for the repair, keeping any retention meanwhile.
- The consumer route. The Consumer Ombudsman mediates out of court between consumers and businesses, without imposing sanctions. It generally takes cases from the past year, with a valid receipt or invoice, where you have contacted the business first and no court case has started.
Keeping a renovation on record when you live abroad
Having a clear contract and a dated handover makes a big difference for owners. It’s also helpful to have someone keeping an eye on things. Yanis visits members’ homes monthly and sends a photo update, which helps spot issues like damp, cracks or leaks early on. Our member services also include renovation, repairs and contractors, quoted separately. If you’re interested in this kind of support for your home in Athens, Apply for Membership.
Frequently asked questions
How long is a contractor liable for defects in Greece?
The Greek Civil Code sets two time limits, counted from handover: ten years for defects in a building or other fixed installation, and six months for other work. Which one applies to a renovation depends on the type of work, so do not assume the longer period.
Does signing off the work end the contractor’s responsibility?
Partly. Once you accept the work, the contractor is generally no longer liable for faults a normal inspection would have revealed at handover. They remain responsible for hidden defects that only appear later and for anything they deliberately concealed. So inspect carefully and keep a dated record of the handover.
What is the difference between a snag and a κακοτεχνία?
A snag is an unfinished or untidy item, such as a sticking door or paint on a tile, normally fixed from a snag list before final payment. A κακοτεχνία is work done wrongly or not as agreed, such as a shower tray without a proper fall or damp behind new plaster. Defects often appear months later and fall under the contractor’s legal liability for the work.
Can I get another tradesperson to fix the defect and charge the contractor?
Be careful. A repair by someone else can remove the evidence of what went wrong and weaken your position. Notify the original contractor in writing first, with dated photos, and give them a fair chance to inspect. In a genuine emergency, such as an active leak, make the home safe, photograph everything before and during the repair and keep the invoice.
Can the Consumer Ombudsman help with a renovation dispute?
It can mediate between you and a contractor operating as a business, out of court. It does not impose sanctions. It generally handles cases from the past year where you have a valid receipt or invoice, have tried to resolve the issue with the business first and have not gone to court.