Last reviewed: November 2026
If your contractor in Greece has abandoned the job and you’re living abroad, here’s what to do: first, make a thorough record of the site as it is now. Then, send a written notice with a clear deadline for them to get back to work. After that, take back the keys and any materials they were using. Next, compare what you’ve paid so far with what’s actually been built. Only then look for a replacement contractor, starting with a survey of the work done so far. Most of the time, stalled renovation projects in Athens get finished by someone else, rather than ending up in court. Good records make every option easier.
Key takeaways
- Photograph and film the whole site before anyone else touches it.
- Put your concerns in writing with a reasonable deadline; phone calls leave no trail.
- Reconcile payments against finished work using your staged schedule and invoices.
- If the engineer or contractor changes, the permit file and e-EFKA registration may need updating.
- Involve a lawyer early if a large deposit is at stake or keys are not returned.
Has your contractor really gone, or just gone quiet?
When a site suddenly goes quiet, there is often an ordinary reason. Athens builders often have multiple projects going on at the same time, and material deliveries can be held up, and August often slows most trades. To determine if a job has been abandoned, wait for two to three weeks with no activity on site and no meaningful reply. If that’s the case, the goal isn’t to pick a fight, but to create a clear record of what’s happened and give the contractor one last chance to get back on track.
What should you do in the first week?
Record the site as it stands
Get someone you trust to take pictures and a video of every room, with the date on them, showing everything. Make sure you show the open walls, pipes and cables, and get shots of the tiling, any materials that are stored, tools that were left behind, and any damage that’s been done. Everything else relies on this record.
Send a written notice with a deadline
Get in touch with the contractor via email or some other way that keeps track of dates. Stick to the facts: when the work came to a halt, how far it had got, what you’re expecting to happen next (like them coming back to the site or giving you a plan for finishing the job), and a reasonable deadline, such as ten working days. Let them know that if you don’t hear back, you’ll find someone else to finish the work. If you want to take a stronger approach, you can have a lawyer in Greece send a formal out-of-court notice.
Secure keys and materials
Ask for any keys back, and think about changing the lock cylinder once the deadline is up. Make a list of materials you’ve already paid for that are still at the property, like tiles or sanitaryware, and keep them there.
How do you work out what you have paid for?
To resolve most issues, start by laying out what was promised at each step, what you’ve paid so far, and when those payments were made. Also, take a look at your photos to see what’s actually been done. If you agreed on staged payments before the work began, as we recommend in our guide on what to agree in writing before the renovation starts, you’ll probably find the gap between what you’ve paid and the actual progress is clearer than you feared.
| Stage in the quote | Paid? | What the site shows | Gap |
| Demolition and strip-out | Yes | Complete | None |
| New plumbing and wiring | Yes | Half the rooms done | Unfinished work already paid |
| Tiling | Deposit | Tiles delivered, not laid | Labour not started |
It’s a good idea to keep all your invoices, receipts, transfers, and messages in one place. This is because some official complaint systems in Greece only accept a case unless you have a valid receipt or invoice to back it up.
What happens to permits and EFKA if the team changes?
In Athens, many renovations run under a building permit or a small-scale works approval, and they usually have a supervising engineer assigned to them. We’ve written about the roles of mastoras, ergolavos and supervising engineer in these projects. If the engineer leaves along with the contractor, you’ll need to update the permit file with the new supervising engineer’s information through the electronic permit system, and your new engineer will take care of this. It’s a good idea to put the work on hold until this is done, so that the paperwork matches what’s actually happening on site.
When you’re doing private building work, e-EFKA considers you, the property owner, as the employer responsible for getting the job registered, even if you’ve hired a contractor to do the work. If your renovation project has an AMOE registration number, you’ll need to report any changes through the e-EFKA construction works registration service, and current guidance asks for this within 30 days. You can get your engineer or accountant to take care of this for you. However, there are some documents that require your own signature, so it’s helpful to know which renovation papers you must sign yourself.
How do you bring in a new contractor without paying twice?
Check out the new person just as you would anyone else, and then share the pictures you took, the first contractor’s quote, and the list of payments you made before they give you their own quote.
- Survey first. Ask them, ideally with your engineer, to state in writing what they will keep, what needs redoing and why. Pay attention to pipes and cables in walls, which are hard to check once covered.
- Rescope. Get a new quote for the outstanding work only, in stages with a payment for each. If they want to redo finished work, ask for reasons and photos.
- Keep the jobs separate. Each contractor has their own quote, invoices and payment trail, so there is never a question about whose work is whose.
Now’s also a good time to think about your home if it’s vacant for most of the year. If that sounds like yours, check out our guide to materials and systems that cope while you are away; it might help.
“When a builder disappears, owners abroad want to fix everything in one phone call. Slow down for a week instead. Get the site photographed room by room, send one clear written message with a date in it, and line up every payment against what is actually on the walls. Once you have that, every conversation that follows is shorter and calmer.”
Yanis Zisis, Founder, Home Watch Athens
When should you involve a lawyer?
If you’ve paid a significant deposit for a job that hasn’t even begun, or if someone’s holding onto keys or materials, it’s a good idea to get a lawyer involved right away. The same goes if your neighbour’s place or shared areas have been damaged, or if the contractor says you owe more.
To make a claim, you’ll need certain records: a quote or agreement, payment schedule, invoices, transfers, dated photos and videos, and any written messages. If you’re a private consumer and the business is in Greece, you can get help from the Greek Consumer Ombudsman. They can mediate if your issue happened in the last year and you haven’t started a court case yet, but first, you need to contact the business yourself.
How we help when a renovation stalls
With our monthly member visits, you’ll get to see the site for yourself, complete with photo updates, so you’re not just taking someone’s word for it. We also offer a renovation oversight service in Athens, which is quoted separately, and this includes things like documenting the site if it’s been abandoned, collecting keys, setting up a survey with a new contractor, and keeping all the paperwork organised in one spot. If you’d like this support, Apply for Membership and tell us where your project stands.
Frequently asked questions
What should I do first if my contractor abandoned the job in Greece?
Start with a full, dated record of the site: photos and a video walk-through of every room and the stored materials. Then send a short written notice stating when work stopped, what you expect and a reasonable deadline. Recover any keys once the deadline passes. These steps protect your position whether the contractor returns, a new one takes over or you speak to a lawyer.
My contractor disappeared with the deposit. Can I get it back?
It depends on what the deposit covered and what was delivered. Compare the payment with the work and materials on site, using invoices and bank records. If the gap is clear, a written demand is the first step, and a Greek lawyer can send a formal notice and advise whether a claim is worthwhile. Keep receipts and invoices, as most formal routes rely on them.
Can I replace a contractor mid renovation in Athens?
Yes. Once your written deadline has passed without a response, you can bring in another contractor. Ask them to survey and document what has been done, then quote only for the remaining stages. Keep their paperwork and payments separate from the first contractor’s, and ask your engineer whether the permit file and e-EFKA registration need updating now that the team has changed.
Who is responsible to EFKA during a private renovation?
For private building work, e-EFKA treats the property owner as the employer responsible for registering the work, even when contractors or subcontractors carry it out. If your job has an AMOE registration number, changes are reported through the e-EFKA online service, and current guidance asks for this within 30 days. Your accountant or engineer can handle it for you.
Do I need to be in Athens to deal with an abandoned renovation?
Not usually. Someone you trust can record the site, collect keys and meet a new contractor while you handle messages and approvals by email. Some permit and registration documents may need your own signature, so ask your engineer early which ones apply.