When you renovate an apartment after buying in Greece, don’t rush into construction. Take the first 90 days to plan. Spend a month checking the apartment’s condition and the building’s rules. Use the next month to set priorities and write a clear brief. Then get itemised quotes, order materials with long lead times and agree a payment schedule before work begins.

Key takeaways

  • Assess before you design: electrics, plumbing, damp and windows decide your budget more than finishes do.
  • Sort the work into must-do, should-do and can-wait, and fix what sits behind the walls first.
  • A written brief gets you quotes you can compare, and stops prices growing once work starts.
  • Check with an engineer which approval route applies before you sign with any contractor.
  • Order kitchens, windows and special tiles early; they set the real start date.

Why the first 90 days matter more than the build

Renovation problems in Greek apartments often begin before the work starts, when the owner agrees a price after a quick look around. A new kitchen gets installed before anyone checks the old electrical system, and the cost keeps going up with each new surprise.

If you’re renovating a resale apartment in Athens, first understand what you’ve got before you start tearing anything out. The admin side of being a new owner (Cadastre registration, tax access, utilities, insurance and the building manager) is covered in our separate new owner checklist. This guide is just about the renovation: assessment, priorities, the brief and procurement.

Days 1–30: assess what you have actually bought

Look beyond what’s visible. Lots of resale apartments in Athens are in buildings from the 1960s to the 1990s, with original or patched systems. When you’re assessing them, make sure to consider:

  • Electrics. The age of the panel, whether there is a residual current device, the number of circuits, and whether the wiring is copper in conduit or older. In Greece an electrical installation has to be inspected by a qualified electrician, who records the results in the installer’s declaration (ΥΔΕ). For homes, the electricity distribution operator’s safety guidance says homes should be re-inspected at least once every 10 years. If you are rewiring anyway, plan for a new ΥΔΕ at the end.
  • Plumbing and drains. Old galvanised pipes, slow drains and signs of past leaks below.
  • Damp and waterproofing. Stains under balconies and on the top floor, salt marks on walls and mould behind wardrobes.
  • Windows and doors. Old single-glazed aluminium frames affect comfort, noise and energy bills.
  • Heating, hot water and cooling. Shared central heating, a gas boiler or heat pumps, and whether the solar water heater still works.

Have an engineer with you for the walk-through, not just a builder who’s trying to get the job. If you have the original plans, compare them with the layout now. Walls that have been moved or balconies that are now enclosed need taking into account before you start making new plans.

Finally, read the building’s regulation (kanonismos) and talk to the diaxeiristis. A lot of buildings have quiet hours, they limit using the lift for materials, and they expect notice before you start any work.

How to set priorities when you renovate an apartment after buying in Greece

Once you know the condition, separate everything into three categories. This is the most useful part of planning a new apartment renovation, as it helps you avoid spending too much on finishes before fixing the issues hidden behind the walls.

Priority Typical items Why
Must-do Unsafe electrics, leaking pipes or drains, active damp, failed waterproofing These damage everything you put on top of them
Should-do Windows, heating and cooling, insulation, bathroom and kitchen layout Hard or costly to change once the home is finished
Can wait Built-in wardrobes, lighting design, decorative finishes, some furniture Can be done later without undoing other work

Tackle anything that involves opening up walls, floors or ceilings first, while the room is still stripped bare. If money is tight, put off the things that can wait rather than skimping on the essentials. A home you use only occasionally also needs durable finishes and systems that are simple and safe to shut off when you’re away.

Check the approval route before you plan the works

Not every renovation in Greece needs a full permit, but most need some kind of approval. Generally, there are three levels: minor works that don’t need a permit, although in many cases an engineer still has to register them online before they start, small-scale works that need a small-scale works approval (EEDMK), and a full building permit for structural work and anything beyond the small-scale limits. For small-scale works, like rearranging the inside of a building without changing the structure, an engineer files for approval online through the Technical Chamber’s e-Adeies system. This approval is valid for one year, as the official procedure page for small-scale works approval explains. If the work affects shared parts of the building, like the outside walls or the structure, the co-owners need to agree to it.

Our guide to renovation permits in Greece lays out the routes. When you’re making a plan, get an engineer to confirm the approval route in writing before you agree to work with a contractor.

Days 30–60: write a brief contractors can actually price

A good brief is the best way to avoid being surprised by rising costs. Without one, each contractor will price a different project, and the lowest price often means something is missing. It should include:

  • A room-by-room scope. What is being removed, what is new and what stays.
  • Systems. Full or partial rewiring, new supply and drain pipes, heating and cooling choices.
  • Finish levels. Not exact products yet, but a clear standard, with a few reference photos or brands.
  • Who supplies what. Whether the contractor buys tiles, sanitaryware and the kitchen, or you do.
  • Rules of the building. Working hours, lift use, waste removal and parking for deliveries.
  • Timing. When the home must be ready, and any weeks when work cannot happen.

Add a measured floor plan and have everyone itemise labour and materials separately. Also, make sure it’s clear that any extra work needs to be approved in writing before it’s done.

Days 60–90: compare quotes and order materials

Try to get two or three itemised quotes and lay them side by side, so you can compare them line by line and see what’s not included, rather than just the price. Often, things like waste removal, protecting the common areas, making good after electrical work and the final clean are missed.

Our renovation works start from €600/m² (excluding 24% Greek Tax). Just remember, contractor quotes in Greece often end up higher than first quoted. So, keep a contingency for surprises once walls are opened up.

Order the long-lead items first

The actual start date usually depends on materials. Made-to-measure kitchens, windows, special tiles and imported sanitaryware can take several weeks to arrive, and August is quiet across much of the Greek supply chain. Get delivery dates in writing and plan where you’ll store everything.

Agree how and when you pay

Link payments to completed stages of the project rather than to dates: demolition and first fix, then plastering and tiling, then the kitchen and bathroom installed, with the final payment at handover, after snagging. Pay against proper invoices and keep all your receipts in one place. Try to avoid giving contractors large cash advances.

“Spend the first month finding out what is behind the walls before you choose a single tile. In older Athens apartments the wiring, pipes and waterproofing decide the real budget, and they are far cheaper to fix while the rooms are empty. Get one written brief, ask everyone to price the same thing, and approve every extra in writing.”
– Yanis Zisis, Founder of Home Watch Athens

How Home Watch Athens can help

We carry out renovations as well as overseeing them, so you’ve got one trusted person on the ground from the first assessment to handover. First, Yanis visits your apartment and then sends you a written scope and an itemised quote, and nothing starts until you approve it. During the works, you’ll get regular photo updates on WhatsApp, including before surfaces are closed up. Once everything is finished, your home can join the monthly Home Watch visit. Find out more about our renovation company in Athens, or Apply for Membership. Yanis replies to every application within 24 hours.

Frequently asked questions

Should I renovate straight after buying or live in the apartment first?

If the electrics, plumbing or waterproofing need work, it is usually better to renovate before you move furniture in, because those jobs mean opening walls and floors. If the home is sound, spending a few weeks in it first can help you decide on layout, light and storage before committing to a design.

How long does it take to plan a renovation in a Greek apartment?

For a typical resale apartment, allow around two to three months for assessment, the brief, quotes, the approval route and ordering materials. The build itself comes afterwards. Rushing the planning stage is the most common reason works overrun, because surprises are priced only once the contractor is already on site.

Do I need an engineer for an apartment renovation in Greece?

In most cases, yes. Even works that do not need a building permit often have to be registered online by an engineer before they begin, and a small-scale works approval is always submitted electronically by one. An engineer can also confirm whether past alterations in the apartment were done legally before you build around them.

Can I renovate an apartment in Greece while I live abroad?

Yes, many owners do, but you need someone reliable on the ground who speaks Greek, knows the building and can check the work at each stage. Agree the scope and payments in writing, ask for dated photos before surfaces are closed, and make sure one person holds the keys and deals with neighbours.

What should I renovate first in an older Athens apartment?

Start with anything hidden: electrics, supply and drain pipes, damp and waterproofing. Then move to items that are hard to change later, such as windows, heating and cooling, and the kitchen and bathroom layout. Decorative finishes, lighting and built-in furniture can follow, even months later, without undoing earlier work.

This guide is general information, not legal or technical advice. Approval requirements depend on your property and the planned works, so for your own situation, always consult a qualified engineer or a lawyer.

Last updated: November 2026