Choosing a renovation company or project manager in Greece comes down to who does the work and who oversees it. A renovation company uses its own tradespeople; a project manager acts as your representative, coordinating and checking the work. From abroad, with no contractor lined up, a renovation company is more straightforward; if you already have one, a project manager on your side is a better fit.

Key takeaways

  • A renovation company carries out the works; a project manager oversees them for you.
  • Neither replaces the engineer, who decides the approval route and files the paperwork.
  • Agree in writing who decides on scope, finishes, changes and payments.
  • Ask for dated photos of pipes and cables before they are covered, and keep a complete project file.

Renovation company or project manager in Greece: what is the difference?

When you hire a renovation company, they handle everything: the price, the workers and supplies, and the final result. You deal with one company and sign one contract. But there’s a downside – the company doing the renovation is also the one keeping you updated on how it’s going.

A project manager works for you. They don’t lay tiles; instead, they help you create a plan, compare prices from different contractors and visit the site. They also check the work against what was agreed and catch problems early. In some cases, they coordinate the separate trades, like plumbers, electricians and tilers, especially when there’s no main contractor.

Renovation company Project manager
Carries out the works Yes, with its own or subcontracted trades No
Coordinates the trades Yes Yes, or checks that the contractor does
Checks quality Checks its own work Checks the work against the scope, for you

Neither option replaces the engineer. In Greece, building paperwork revolves around the owner and the engineer. For instance, for small-scale works approval, the owner submits the request and the engineer files the application electronically and is accountable for it.

Who else is involved in a renovation in Greece?

No matter what you decide, renovating a home in Greece usually means dealing with more people than you’d expect:

  • The engineer. Checks the property’s planning status, decides the approval route and files it. Many renovations need no building permit, but wider internal rearrangements and some other works need small-scale works approval first. Our renovation permit guide explains the routes.
  • Licensed trades. Plumbing, heating, gas and air conditioning are regulated trades. New or modified electrics must be inspected, and the electrician records the result in an Installer’s Declaration (Υπεύθυνη Δήλωση Εγκαταστάτη, or ΥΔΕ), which the owner or user also signs. HEDNO’s guidance on electrical safety at home sets this out. If you are abroad, plan for that signature.
  • The building. Tell your diaxeiristis (building manager) and neighbours about dates, deliveries and noisy days. Many buildings set working hours in their building regulation, and works that affect shared parts, such as the roof, façade or structure, usually need co-owners’ consent.
  • e-EFKA. Building works, including repairs and renovations, may need registering with e-EFKA, the national social insurance body, before they begin. The owner is generally the responsible party, even when a contractor does the work, so ask at the outset whether your project needs it and who will file it.

Which option fits your project?

The first thing to think about is the scope. If you’re just doing a quick refresh, like a fresh coat of paint or new flooring, one reliable contractor and someone to let them in and check the result is usually enough. A bigger job, like redoing the kitchen or bathroom or giving an old apartment a complete overhaul, is more complicated: multiple tradespeople, one after the other, and decisions almost every week. Works that move walls or touch shared parts of the building need an engineer from the very beginning.

Be truthful about your own circumstances. How often can you actually visit? Do you speak Greek? Do you already have a reliable contractor? If so, it makes sense to have someone oversee the project for you. If not, a renovation company that manages its own works saves you from assembling a team in another country. One approach that rarely works is hiring individual tradespeople from abroad with nobody on site to supervise.

The budget is something else to think about: works start from €600 per square metre, excluding 24% Greek Tax. When you get quotes from contractors in Greece, they often end up higher than first quoted. Our guide to apartment renovation costs in Greece breaks it all down.

How do you renovate an apartment in Athens from abroad, from brief to handover?

The steps are the same whoever leads; what changes is who carries each one out.

  1. Brief. What you want, how you will use the home, a budget range and a finish date, plus a floor plan, photos and any property documents.
  2. Survey. Someone walks the home with each contractor before they quote, checking plumbing, wiring, damp, access and the lift.
  3. Engineer’s check. The approval route, the property’s legal status and any registrations. Nothing starts until the paperwork is in place.
  4. Scope and quotes. A written scope of works and itemised quotes, compared line by line.
  5. Agreement. Scope, materials, programme, payment stages tied to progress, how changes are priced, working hours, rubble removal and the final clean. Our guide to paying contractors in Greece from abroad covers staged payments.
  6. Selections. You choose tiles, sanitaryware, kitchen units and paint from samples and photos, within agreed allowances, before the trades need them.
  7. Works. Site visits as the work progresses, photos at each stage, and every change priced and approved in writing before it is done.
  8. Sign-offs and handover. The electrician’s declaration, any engineer’s paperwork, a snag list, the fixes, a final clean and the keys.

Who should manage a renovation in Greece: who decides and who is on site?

If a renovation run from another country doesn’t go as planned, the issue is often who was allowed to make decisions. Agree this before the work begins.

Decision Who decides Who advises
Scope and budget You Company or project manager
Approval route and anything structural The engineer, with your application –
Finishes and materials You, within agreed allowances Company or project manager
Day-to-day order of the trades The contractor Project manager checks progress
Changes and extra costs You, in writing, before the work Whoever is on site
Payments You, or someone you have authorised within set limits Project manager checks invoices
Accepting the finished work You, once the snag list is cleared Project manager

The contractor’s lead will be on site most working days, but it’s a good idea to have someone representing you there too. This person should be present at the important moments: the start, before pipes and cables are hidden from view, before tiling and fitting, at handover and if anything unexpected comes up. The engineer will attend where the approval requires it. You don’t need to be on site often, but a final walk-through can be very helpful. And don’t forget to decide who will hold the keys.

“Before the first wall comes down, decide who your one point of contact is, and agree that every change gets a price and your written approval, even if it is a two-line WhatsApp message. Most renovation arguments I have seen in Athens start with a change agreed on the phone. And insist on photos of pipes and cables before anything is tiled over, because after that nobody can show you where they run.”
– Yanis Zisis, Founder of Home Watch Athens

What records should you receive?

If you can’t see the work, the records show you what’s happening. By handover, you should have:

  • The written scope of works, the approved quote and the agreement
  • The engineer’s paperwork, where the works needed an approval
  • Dated photos from each visit, including pipes and cables before they were covered
  • A change log: each change, its price and your written approval
  • Invoices and proof of every payment
  • The electrician’s Installer’s Declaration (ΥΔΕ) for new or modified electrics
  • Warranties, manuals and product details such as tile codes and paint references
  • The snag list, signed off once every item is fixed

Make sure to keep a copy for yourself. Tile codes and paint colours seem like small things, but they matter when something breaks years later and you need an exact match.

How Home Watch Athens can help

Home Watch Athens carries out renovations as well as overseeing them, so we can handle the entire project or work with a contractor you’ve already hired. With renovation oversight, Yanis supervises your contractor on site and keeps you updated with photos on WhatsApp. If you’d prefer one team to take care of everything, our renovation company in Athens service manages the project from start to finish. We are there to guide you, not to profit from you, and once the work is done, your home can move onto our monthly Home Watch visit. To get started, Apply for Membership: Yanis replies to every application within 24 hours.

Frequently asked questions

Do I need a project manager if I hire a renovation company in Greece?

Not always. If you can visit at key stages, speak some Greek and trust the company, you may manage without one. If you can’t be there, someone on your side can check the work against the agreed scope, go through changes with you and confirm progress before each payment.

Can I renovate an apartment without being there?

Yes, provided someone you trust is on site at the moments that matter and decisions are agreed in writing. You will still choose finishes, approve changes and sign or approve some documents, such as the electrician’s declaration and your engineer’s application. Plan how you will handle those from abroad, digitally or through an authorised representative.

Is a project manager the same as an engineer in Greece?

No. The engineer has a defined legal role: checking the property’s status, choosing the approval route, filing it electronically and taking responsibility for that filing. A project manager coordinates people and timings and reports to you, but unless they are a licensed engineer, they cannot file approvals or take on the engineer’s legal responsibility for them.

Can one company both carry out and oversee my renovation?

A renovation company can manage its own project well, and one point of responsibility is a real advantage. What it cannot give you is independent checking of its own work. If that matters to you, keep the roles separate: one party carries out the works and another checks them on your behalf.

This guide is general information, not legal or tax advice. For your own situation, you can always consult a lawyer or a licensed engineer.