Last reviewed: November 2026
Which swimming pool permit Greece asks you for depends on how the pool is built. According to the 2026 planning code, Law 5306/2026, if you’re putting in a small pool – up to 50 square metres, without a roof, and no more than 1 metre above the finished ground – you can use small-scale works approval, provided your pool needs no more than 1.5 metres of digging and no reinforced-concrete wall. But if your pool is bigger, or a traditional poured-concrete one, you’ll need a full building permit. Either way, an engineer submits the application online, and you can’t start digging until you’ve got the approval number.
Key takeaways
- Every pool built or installed at a house needs either a building permit or small-scale works approval.
- The lighter route has six physical conditions and a statutory budget ceiling, and all must be met.
- A pool does not count towards plot coverage, but the planting rule still applies.
- Afterwards the pool goes on your E9, and at a house you are away from it is worth planning a cover, a fence and someone to look at it.
Do I need a permit for a pool in Greece?
Yes, and there are two ways to go about it. Article 315 of the Spatial and Urban Planning Code, which is Law 5306/2026, published in Government Gazette A 88 on 8 June 2026, says that building a pool is one of the works that need a building permit. But it also offers a simpler option – small-scale works approval. Article 316 of the Code lists the works that don’t need either, and pools are not on that list.
The Code brings together the earlier planning laws in one place, so the swimming pool regulations Greece applies are familiar ones, just with new article numbers. Our guide explains the three permit routes for renovation work, which gives you the general framework.
Which pools qualify for small-scale works approval?
Article 315, paragraph 2, talks about placing a pool without a roof where all of the following are true:
- the surface is no more than 50 square metres;
- it is served by an external, compact plant unit;
- installing it needs no reinforced-concrete wall;
- no part of it rises more than one metre above the final ground level;
- the natural ground is not excavated or filled by more than 1.5 metres;
- the planting required in the plot’s mandatory open space is in place.
Another test is applied. If the statutory budget of small-scale works is over €25,000 per ownership unit, they need a building permit. This also applies to pools, which are not exempt from this rule. The budget is worked out using an annex to the Code.
If you have a flat garden, a prefabricated pool or one with panels and a liner can fit. But a big pool, one with a deep end or a poured-concrete pool won’t.
What decides the route: size, depth, boundaries and plot coverage
Size and depth
The rules don’t restrict how deep the water can be, but they do limit how big the surface is and how much you can dig. If you go over 50 square metres, dig or fill by more than 1.5 metres, or go more than 1 metre above the final ground level, you can’t take the easier route any more.
Distance from boundaries
A building has to keep mandatory distances from the edges of the plot. Article 212 says you can have a pool inside those distances and, when it’s below the final ground level, right up against the boundary. The engineer marks where the pool goes and how big it is on a copy of the topographic plan.
Plot coverage and planting
Article 207 doesn’t include open-space structures like pools when working out plot coverage. What matters is planting: at least two thirds of the mandatory open space has to be left unpaved and planted. The pool itself counts towards that share, but the paved terrace around it doesn’t.
Which extra approvals apply near the coast, forest or antiquities?
Article 327 blocks the small-scale route in certain areas, like forests, stream beds, the seashore and beaches, archaeological sites where building is not allowed, or absolute protection zones. If a pool is planned somewhere else that needs special approval from groups like the Ministry of Culture or the Architecture Council, this approval is added to the project file.
For the building permit, Article 322 puts a pool in Category 3. But works on a plot that touches a defined seashore or beach line, or a delineated stream, are Category 1, which along the Athens Riviera mainly concerns plots right on the water.
Above-ground and prefabricated pools
The lighter route is for pools that are placed, not cast. An above-ground pool in your garden still needs approval first, and if it stands more than 1 metre above the finished ground, it fails the height condition. The file includes the application, a technical report from an engineer, a cadastral extract, photos, the topographic plan with the pool marked on it, an electromechanical study, and a structural study or adequacy certificate.
Small-scale works are allowed at buildings that exist lawfully or have been regularised, so the engineer starts from the permit your house already has. If you can’t find your copies, we have a guide to finding the building permit and floor plans of your home. A shared garden also needs the consent of your co-owners – we explain shared plots in our post about renovating a maisonette or detached house on the Riviera.
How does the building permit route work?
To get a building permit, the file needs a certificate from the local building service that sets out the building terms for your land. This certificate has to be issued within 10 days of the application, and it’s based on Article 324. Then, the engineer sends the file electronically. A pool permit Athens building services issue goes through the same steps as anywhere else in Greece, and the permit is valid for 4 years. You can start building as soon as you get the permit number. Finally, a building inspector comes to check the position and dimensions of the pool.
When the engineer uploads all the necessary documents, the lighter approval is issued automatically and it’s valid for 1 year. The official steps are on the national registry page for small-scale building works approval.
Water: filling and topping up in Attica
A pool that’s eight metres long and four metres wide, with an average depth of 1.4 metres, holds around 45 cubic metres of water. As of November 2026, EYDAP hasn’t restricted household use in Attica, including filling private pools. But it is asking everyone to save water. Its water-saving advice for households includes checking your hoses and fittings for leaks.
If you’re building a pool in Greece today, design it to use less water, with a cover that limits evaporation and pipes that are pressure-tested before you bury them. We have a guide to looking after a pool at an empty villa, which covers the running routine.
What a pool adds afterwards: E9, ENFIA, presumed income and insurance
When you make changes to your property, like adding a pool, you need to update the E9 to reflect that. AADE’s deadline is 31 January of the year after the change, and you can file the updated declaration online using the AADE E9 and ENFIA service. ENFIA is an annual charge, and it’s based on the property you hold on 1 January.
When it comes to income tax, Article 31 of the Income Tax Code (Law 4172/2013) attaches a presumed expense to a pool each year, based on its surface. But Article 33 of the same Code says that if your tax residence is outside Greece, this presumption does not apply.
Home insurance works in a similar way. The policy schedule has details about the property as it was before, so a finished pool gets added to the schedule too.
A pool at a house you are away from
When planning a pool, think about the safety items while it is still on paper. A rigid safety cover keeps children and pets from getting into the water and reduces evaporation. A fence with a self-latching gate belongs in your design too. Be careful with an automatic top-up valve: if the house is empty, it can quietly replace whatever a leak removes.
We check a few things when we come to your house each month. The pool contractor does the testing and cleaning. We look at the water level, check the cover, and look at the gate latch. We also take a look at the plant enclosure. You can see pictures of all these things in the photo update we send you.
“Before a digger arrives, I ask for the approval with its number and the plan with the pool drawn on it. On excavation day I want a photo of a tape measure standing in the hole. If the plan says a metre and a half and the tape says two, the pool has just changed category, and that is easier to stop that afternoon than to explain a year later.”
Yanis Zisis, Founder, Home Watch Athens
Managing the build from abroad
You’ve got three key people: the engineer who files the paperwork and signs it, the contractor building your pool, and someone who’s on site to represent you. It’s a good idea to ask for dated photos of each stage, especially the parts that you won’t be able to see once they’re finished:
- the pool set out on the ground, measured from the boundaries;
- the finished excavation, with a tape showing its depth;
- the shell and pipework in place, before backfilling;
- the first fill, and the level again several days later.
Our members use our renovation oversight service in Athens for this. It is quoted separately from the monthly visit: we visit while the work is being done, send photos before surfaces are closed up, and keep a dated record of each visit. If you want that presence at your home, Apply for Membership.
Frequently asked questions
Do I need a permit for a pool in Greece if it is small?
Yes. A roofless pool of up to 50 square metres with no reinforced-concrete wall, which also meets the other conditions of Article 315 and stays under the budget ceiling, goes through small-scale works approval, filed electronically by an engineer. Any other pool, including one with reinforced-concrete walls, needs a building permit.
Can a pool be built right up to the edge of my plot?
Article 212 of the Code allows a pool inside the mandatory distances that the building keeps from the plot boundaries and, below the final ground level, in contact with the boundary. The planting requirement still applies, and the engineer marks the pool’s position on the topographic plan.
How long is a pool approval valid?
Small-scale works approval is valid for 1 year, and its validity can be revised for 1 more year. A building permit is valid for 4 years, which is ample for a pool but matters if the pool is part of a larger project.
Does a pool change my Greek property tax?
The pool is declared on your E9 by 31 January of the year after it is built, and ENFIA is charged each year on the property you hold on 1 January. Separately, the Income Tax Code attaches a presumed annual expense to pools, which does not apply to people whose tax residence is outside Greece.
