Last reviewed: November 2026

Net billing in Greece matches your solar panels’ electricity production against your home’s usage at the same time, and this is the scheme a new household system joins today. Any extra energy your panels produce gets sent to the grid and you get a credit on your bill, but that credit is valued at the wholesale market rate, not what you pay your supplier. A house that’s empty for months isn’t using much power during the day, so most of the energy its panels make gets exported.

Key takeaways

  • Net billing rewards electricity used as it is produced; exported surplus is credited at a wholesale-based value.
  • The rules were reissued on 14 September 2026, with a household programme for systems up to 10.8 kW.
  • You sign a connection contract with HEDNO and a netting contract with your supplier.
  • In an empty house a battery helps, and an inverter fault can go unnoticed for months.

What is net billing, and how is it different from net metering?

The old way of doing things was called net metering, or ενεργειακός συμψηφισμός. Any extra units you sent back to the grid were subtracted from the units you used from the grid over a long period. In effect, the grid was like a storage system: it saved the energy you made in the summer for when you needed it in the winter. People who already have contracts can keep them going, and can switch to net billing if they want.

With net billing (ταυτοχρονισμένος συμψηφισμός, “simultaneous netting”), the energy your home produces is compared with what it uses, interval by interval, tracked by a meter that HEDNO, the company running the network, can read from afar. If your house is using power at the exact moment you’re producing it, that energy is used right away and you don’t have to buy it. If not, the extra energy gets sent out and its value is determined by the Day-Ahead Market, the wholesale electricity market. For homes with systems up to 10.8 kW, the credit for that extra energy shows up on the electricity bill of the same supply.

When you’re not home, the question isn’t really how much energy your roof will make, it’s what’s still using power in the house while you’re away.

What did the 2026 changes mean for a house?

New rules for self-consumption were put in place thanks to Law 5299/2026. Article 51 of the new law added a fresh paragraph to Article 14 of an older law, Law 3468/2006. The Ministry of Environment and Energy then used this update to reissue the rules in a ministerial decision (Government Gazette B’ 5573). This happened after the energy regulator, RAAEY, gave its opinion, and the new framework replaced the one from 2024 when it took effect on 14 September 2026. For a household, this means:

  • The household programme stays. Residential systems up to 10.8 kW have the value of their surplus credited on the electricity bill.
  • Batteries have a clear place. A battery can be added to a solar system under set conditions and, for the first time, installed with no panels at all, for your own use only.
  • More is digital. Smart meters are fitted faster, and an electronic register of self-consumers is being set up.
  • Older systems carry over. Transitional provisions bring them into the new framework at no extra charge.

There are also small plug-in systems, which are new and follow their own procedure, and we’ve got a guide that explains plug-in balcony solar panels and the 800 W limit. Panels on the shared roof of an apartment building need a vote of the other owners, and that’s a separate subject, as are grants for renovations.

The steps, and who signs what from abroad

For HEDNO to accept the system, you need an active electricity supply in your name. So, if the account is still in your parent’s name, you’ll need to transfer it first. And if you own a house with someone else, you’ll need their written agreement. A single-phase supply can handle up to 5 kW. If you want the full 10.8 kW of panels, you’ll need a three-phase supply, and the system’s output will be limited to 10 kW.

  1. Design. The installer surveys the house and an engineer signs the technical documents.
  2. Notification to HEDNO. Small household systems need only a simple notification, not a full connection offer. It goes in through HEDNO’s online application platform for renewable energy stations, which covers the mainland and the interconnected islands and is entered with Taxisnet codes. It names the responsible engineer and includes your own solemn declaration, which gov.gr issues electronically.
  3. Connection contract. If the local network has room, HEDNO issues the contract and you sign it.
  4. Installation. Panels, inverter and a production meter.
  5. Netting contract. You sign this with your electricity supplier.
  6. Activation. You and the engineer each sign a declaration that the system complies. HEDNO replaces the supply meter with a two-way one where needed, then checks and seals the meters.

You don’t need to be physically present. Taxisnet codes can be used from anywhere, and the gov.gr authorisation service issues an authorisation that allows someone to act on your behalf, using Taxisnet codes or Greek web banking and an SMS code. If you switch supplier later on, you’ll sign a new netting contract with the new one. Our guide to choosing an electricity plan for an empty holiday home explains the fixed charges that will still be on your bill either way.

Planning: roof type, approvals, coastal and protected areas

Rooftop systems of up to 100 kW don’t need a building permit, according to HEDNO’s guidance. A small-scale building works approval is required only where special provisions call for it, and it is filed online by an engineer through the e-Adeies system. For buildings in traditional settlements, buildings that are listed, or a house near archaeological sites, you might need extra approvals, such as one from the Architecture Council.

The type of roof you have matters more. On a flat concrete roof, the frames are held down with weights or attached right through the waterproof layer, and every fixing can potentially leak. On a tiled roof, the hooks go under the tiles and into the roof’s structure. Whenever the roof needs to be resealed, the panels have to be removed, so the roof is fixed before the panels go on. Our guide to renovating a maisonette or detached house on the Athens Riviera explains why the shell comes first. Near the sea, the salt air and wind will affect the frames and fixings. A solar water heater is a different thing: it heats water directly and doesn’t connect to the grid, although the tank can shade a panel.

Why do batteries matter more when nobody is home?

Even when a house is empty, it still uses some power all the time: things like the fridge and the router are always on, and perhaps a pool pump too. During the day, solar panels can cover this small amount of power, and any extra they make is exported to the grid. But at night, the house has to buy power from the grid. That’s where a battery comes in: it can store some of the extra power the panels make around midday for use in the evening. This is a typical use for storage, as noted by HEDNO itself.

Timers can do a similar job: set your pool pump or electric water heater to run in the middle of the day, so it uses the energy you’re producing at that time.

Upkeep while you are away

Two things can go wrong without making a fuss. First, there’s the dirt. When Saharan dust settles, it leaves a layer that can turn into mud with just a little rain. A simple rinse with plain water and a soft brush is enough. The other issue is with the inverter. After a storm or a power cut, it might stay off or show a fault code, and since nobody’s around to notice, the system produces nothing until someone checks on it. Get access to the inverter’s monitoring app, not just for yourself, but also for one person in Athens.

The rest belongs with the outside checks of your house that we cover in our guide to looking after a detached house in Athens from abroad. Check for fixings that need tightening after strong wind, loose cables, and new shade because a tree has grown taller.

Questions to ask an installer

  • What share of the output will the house use directly in the months it is empty?
  • Who prepares and files the HEDNO notification, and which papers will I be given at the end?
  • How are the frames fixed, and who removes the panels if the roof needs resealing?
  • Can a battery be added later, and who answers a fault report when I am abroad?

“Before you sign for panels, put twelve months of electricity bills on the table and mark the months the house was empty. Size the system for the house you really use, not for the roof you happen to have. And make sure one person in Athens can see the inverter. I have walked into houses in spring where it had been off since a November storm.”

Yanis Zisis, Founder, Home Watch Athens

How Home Watch Athens can help

As a member, you can expect a monthly visit from Yanis to your home, which includes a photo update. This is a natural moment for Yanis to look at the inverter display and take some photos of the panels from the ground. While the system is being installed, our renovation oversight service for owners abroad, a member service quoted separately, means that Yanis will let the installer and HEDNO’s crew in and send you photos of the work. If you’d like someone you know keeping an eye on your house, Apply for Membership.

Frequently asked questions

Is net metering still available for a new house system in Greece?

A new household system today is set up under net billing, through the residential programme for systems up to 10.8 kW. Since 2024 HEDNO has accepted new net metering applications only from a few special categories, such as farmers and public bodies. Net metering continues for owners who already hold a contract, and they may move to net billing if they choose.

Am I credited for electricity the panels export while the house is empty?

Yes. For a household system up to 10.8 kW, the value of the exported surplus is credited on the electricity bill of the same supply. That value comes from the wholesale Day-Ahead Market, not from your supplier’s retail rate, and it shows on the bill your supplier issues for that supply.

Can I arrange solar panels on my Greek house without travelling?

Yes. The notification to HEDNO is filed online with Taxisnet codes, your solemn declaration is issued electronically through gov.gr, and a gov.gr authorisation allows someone in Greece to act for you. The electricity account must be in your name. What does need a person on site is access for the installer and for HEDNO’s crew.

Do solar panels on a house in Greece need a building permit?

No. HEDNO’s guidance is that rooftop systems up to 100 kW need no building permit. A small-scale building works approval, filed by an engineer through e-Adeies, is needed only where special provisions require it. Traditional settlements, listed buildings and archaeological areas can bring extra approvals before anything is fixed to the roof.