Replacing windows in an Athens apartment goes smoothly if you work in order. Get the openings measured, write down exactly what you want, and compare quotes on the same basis. Before work begins, have a licensed engineer confirm the approval route. Check the building’s rules on the façade, plan how big frames will reach the apartment, and fit the windows at the right point in any wider renovation.

Key takeaways

  • Compare quotes only against one written specification: frame system, glazing, shutters, sills, removal of old frames and finishing.
  • Replacing frames and glazing in the same opening is listed among works that need no building permit, but an engineer should still confirm the route.
  • Changing the colour, material or division of windows on the façade may need the other owners’ agreement.
  • In a renovation, windows are fitted after the messy works and before final painting and sealing.
  • Allow several weeks between final measurement and installation, as frames are made to order.

When is replacing windows in an Athens apartment worth it?

A lot of apartments in Athens still have their old frames: single-glazed aluminium, sun-dried timber, or sliding balcony doors that don’t shut properly anymore. Greeks call windows and doors koufomata, and you’ll hear the word from every supplier.

Common reasons to replace them are draughts, condensation around the frames, rain seeping in under balcony doors, street noise and high energy bills. For the wider picture, see why an Athens apartment is cold in winter. If the issue is just one door that’s leaking, you might be able to fix it by clearing out the drainage slots and replacing the seals. But if the frames are bent, corroded, or single-glazed all over, window replacement in Athens is probably the better long-term answer, and it’s easiest to do as part of a bigger renovation.

Getting measurements and a specification right

Every window is custom made. A first measurement gives you a price. Then the installer takes the final measurements, known as teliki epimetrisi, before production starts. In older buildings openings are rarely square, so each needs measuring in several spots.

Before you ask for prices, write a short specification. It should cover:

  • Frame system: thermal-break aluminium, uPVC or timber, with the system name and profile series
  • Glazing: double glazing as a minimum, with low-emissivity glass for energy efficient windows in Athens; laminated or acoustic glass where safety or street noise matters
  • Opening type: sliding, lift-and-slide, tilt-and-turn or casement, room by room
  • Shutters: whether you keep the existing roller shutters (rolla) and boxes or replace them, and whether you want insulated shutter boxes
  • Sills and sealing: how the frame meets the marble sill (podia), and what sealants and membranes are used
  • Colour and finish: inside and outside, matched to the building’s façade
  • Scope of work: removal of old frames, making good the plaster around openings, debris removal and final cleaning

Ask each supplier for the technical data sheet, including how well the windows keep heat in (the U-value) and how much noise they block. Two quotes for “double-glazed aluminium” can describe very different products.

How to compare window quotes

Quotes are usually priced per item or by the square metre, on different assumptions, so compare them against your specification.

Check What to look for
Product Same frame system, glazing build-up and hardware
Installation Fixing method, sealing around the frame, insulation of the gap
Extras Shutter boxes, mosquito screens, sills, plaster repairs
Removal Old frames taken away and debris disposed of
Lead time Production and installation dates in writing
Warranty Separate terms for the frames, glass, hardware and installation
Tax Prices shown with and without 24% Greek Tax

The cheapest option often leaves out fixing plaster or taking out old frames, and contractor quotes in Greece often end up higher than first quoted. Ask for everything not included to be written down, and pay in stages: a deposit on order and the rest after the job is done and checked.

If you pay income tax in Greece, as of November 2026 there is a tax reduction for renovation work, including new windows. This applies to expenses from 1 January 2024 to 31 December 2026. You need invoices showing your name, AFM and the property’s ATAK, and you must pay electronically. It only reduces tax you actually owe and is not refunded. Also, grant schemes such as Exoikonomo have their own set of rules, and the 2025 round was only open to main residences.

What the building and your engineer need to check

Under Greek planning law, replacing internal or external frames and glazing in the same opening is listed among works that don’t need a building permit. Before you start, a licensed engineer should confirm that your project really fits this category and issue any electronic certificate required. They should also check whether special rules apply, for example to a listed building or a protected zone.

Making an opening bigger, creating a new one or turning a window into a balcony door follows a different process. Changes to the openings on the façade can fall under the small-scale building works approval, which an engineer files online, as long as the changes don’t affect the load-bearing structure of the building. Our guide on whether you need a permit to renovate an apartment in Greece explains the main routes.

The façade is a common part of a polykatoikia, so all owners have a say in it, and in many buildings the rules say windows and shutters should look the same for all flats. Changes like switching from white to anthracite, changing from timber to aluminium frames, or changing how a window is divided may need the other owners to agree. Check the building’s rules and talk to the diaxeiristis early on. If you do need permission, bring it up at the building owners’ meeting before you place an order.

“Before any supplier measures, I find out what the building expects on the façade and what our engineer needs to sign off. Then every quote is priced against the same written specification, including removal of the old frames and the plaster work around them. That is how you avoid choosing the cheapest price and paying for the gaps later.”
– Yanis Zisis, Founder of Home Watch Athens

Installation access and working in an occupied building

Large balcony doors and lift-and-slide panels often won’t fit in a small Athens lift or up a narrow staircase. Ask your installer how each piece will reach your apartment, as very large panels may need lifting from the street. If equipment has to stand on the pavement or road, the installer should check the municipality’s requirements.

A typical apartment usually takes one to a few days on site. Removing old frames is loud, so let the diaxeiristis and your neighbours know the dates. Cover the lift and stairs, and agree how the old aluminium and glass will leave the building. If the flat is an older one, our guide to renovating an old apartment in Athens covers what tends to be hiding behind the walls.

If the apartment is empty, someone still has to let the team in, check that all the windows and doors open, close and lock correctly, and make sure the place is weathertight at the end of each day.

Sequencing windows with other renovation finishes

In a wider renovation, timing matters. A common order is:

  1. Demolition and removal of old frames, or fitting sub-frames (psevdokases) where the system uses them
  2. Electrical and plumbing works, and any chasing in walls near the openings
  3. Plaster repairs around the openings and new sills if they are being replaced
  4. Installation of the new frames and glass
  5. Floors, final painting and silicone sealing inside

Put the windows in too soon and they get dirty and damaged; wait too long and your home is exposed to the elements. Leave the protective covering on until the messy work is done, but not for months in direct sunlight, or it can bake on.

Spring and autumn are good times for new windows, and production takes several weeks after the final measurement, so order early. Any energy performance certificate issued later will reflect the new windows.

How Home Watch Athens can help

We carry out renovations in Athens as well as overseeing them, and window replacement is often part of that work. Our renovation oversight service helps you set the specification, compare quotes on the same basis, work with your engineer and the diaxeiristis, and make sure everything is done right on site. Renovation works start from €600/m² (excluding 24% Greek Tax). Before we begin, we agree on what needs to be done in writing. You can Apply for Membership and Yanis will get back to you within 24 hours.

Frequently asked questions

Do I need a permit to replace windows in my Greek apartment?

Replacing frames and glazing in the same opening is listed among works that do not need a building permit. Even so, an engineer should confirm your job fits that category and issue any electronic certificate needed before work starts. Widening or creating openings, or work on a listed building or in a protected area, can need a different approval.

Can I change the colour or style of my windows?

Possibly, but check first. The façade is a common part of the building, and many buildings expect a uniform look. A change of colour, material or window division may need the agreement of the other owners. Read the building’s regulation, speak to the diaxeiristis and, if needed, put it on the agenda of the owners’ meeting before ordering.

Which frame material is best for an Athens apartment?

Thermal-break aluminium is the most common choice because it copes well with strong sun and suits most façades. uPVC performs well thermally and is popular for its value, while timber suits older or character buildings. Whatever you choose, the glazing, seals and quality of installation affect comfort as much as the frame itself.

How long does window replacement take?

Production usually takes several weeks after the final measurement, as frames are made to order. On site, a typical apartment takes one to a few days, depending on the number of openings and the plaster work around them. In a wider renovation, plan the windows after the messy works and before the final painting.

Can I manage window replacement while living abroad?

Yes, with the right person on the ground. Someone needs to be present for the final measurement, give access on installation days, check each frame opens and locks properly, and confirm the home is weathertight. Photos at each stage and payments tied to clear milestones keep you in control from a distance.

This guide is general information, not legal or tax advice. For your own situation, you can always consult a licensed engineer, a lawyer or an accountant.