Last reviewed: November 2026
Insulating the outside of an entire apartment building, or θερμοπρόσοψη πολυκατοικίας, is usually not a standalone task. It is often part of a bigger energy upgrade that includes the roof, shared heating, and common areas. This process typically follows a specific order: first, an engineer’s study and an energy certificate for the building, then a general assembly where the owners decide on the project and choose a representative, then the works, and finally a second energy inspection. If you own a flat in the building but live elsewhere, your role is fairly simple: you will need to vote on the project or send a proxy, sign some documents, decide if you want your own flat to be included, and make sure the workers can get in when they need to.
Key takeaways
- Nothing starts without a general assembly decision, and in the funded route the building also needs a representative and its own tax number (ΑΦΜ).
- Scaffolding time is the right time to repair cracked concrete and balconies, before insulation covers them.
- From abroad you can take part with a proxy and a gov.gr digital authorisation, but you need to plan for access to your flat.
What does a whole-building energy upgrade usually include?
A lot of older buildings in Athens don’t have much insulation in the walls or roof, which means the same issues keep coming up. When your building’s engineer takes a look, they will typically check:
- Thermoprosopsi: insulation boards fixed to the outside walls and finished with render. If you want the technique itself explained, we cover how external insulation works and the permit it needs in a separate guide.
- Roof insulation: the flat roof (δώμα) of a polykatoikia loses a lot of heat, and it is often insulated in the same project. The question of who pays for roof insulation in a Greek apartment building has its own article.
- Shared heating: replacing an old central oil boiler, switching fuel, or moving to autonomous heating so each flat controls and pays for its own use.
- Common areas: works on shared spaces and systems, such as new stairwell windows or more efficient stairwell lighting.
Under the official programme rules, insulated walls and roofs must meet the minimum standard set by the Greek energy performance regulation (ΚΕνΑΚ), so the engineer decides how thick the insulation should be and what it should be made of.
How does the process work, step by step?
The order we’re following is based on the whole-building approach outlined in the Εξοικονομώ 2021 programme, which gives the most straightforward official guide on how to treat a polykatoikia as a single project.
1. Engineer’s study and the first energy certificate
An energy inspector does the first inspection and gives the building an Energy Performance Certificate, also known as ΠΕΑ. In the funded programmes, the goal is to improve the building’s energy rating by at least three classes. If you are wondering what each energy class letter means for an older flat, we explain it in a separate guide.
2. General assembly decision
The owners get together and make decisions about participating in the programme, doing the works, and choosing someone to represent them. The rules of your building (κανονισμός) and Greek law for shared properties determine how many people need to agree.
3. Representative, tax number and paperwork
When it comes to getting funding for a building project, there are a few things to keep in mind. First, the programme FAQ requires a valid tax number, known as an ΑΦΜ, for the building’s management: the building manager gets it from the competent tax office. Then, the representative and the owners who are taking part in the project submit the application together. The assembly should also figure out how to collect and manage the money for the works.
4. Individual flats join with their own works
If you’re an owner who wants to participate, you can also plan some changes for your own flat, like getting new windows. But to qualify, the works must be on your own property. When you put in a building application, it has to include projects for shared spaces. If it doesn’t, each flat has to apply on its own.
5. Works and the second energy certificate
Once the work is done, another energy inspector comes in to check everything again. This second inspector must be different from the first one. After that, they issue a second ΠΕΑ, which says if the target was met or not.
Funding programmes are always changing, so it’s a good idea to check what’s available. Right now, the Εξοικονομώ programme is mostly for individual homes. If you’re thinking of applying for a grant, go to the official Εξοικονομώ programme website to see what you can get, and make plans once you know what’s on offer.
Why is scaffolding time the moment to fix concrete and balconies?
When the insulation and render are applied, the walls are hidden from view for a long time. Problems like cracked concrete, rusting steel or damaged balcony edges underneath will keep getting worse out of sight. While the scaffolding is still up, it’s a good idea to:
- Ask the engineer to inspect columns, beams and balcony slabs and repair damaged concrete before insulation starts.
- Ask whether a structural engineer should assess the building’s earthquake resistance at the same time, especially in an older building.
- Check old pipes and rainwater drains running on the facade or roof. If your flat also has weak water flow, it is worth knowing whether the building pump or old pipes are to blame for low pressure before everything is closed in.
When repairs are discovered during the works, the general assembly typically decides how to handle them as additional charges. These charges are then divided among the owners, usually based on the building’s regulation, and often using millesimal shares, known as χιλιοστά.
What will an owner abroad be asked for?
Missing signatures hold everyone up. Expect to be asked for:
- Your vote or a proxy: if you cannot attend, check what form of written proxy your building’s regulation accepts and send it before the meeting.
- Authorisations: you can issue a digital authorisation through the gov.gr authorisation service using your Taxisnet or web banking details. Greek rules give it the same weight as a document with a certified signature.
- Documents: proof of ownership, your tax number, and, if your flat joins with its own works, the documents the programme asks for.
- Access to your flat: new windows, heating changes and some facade details need someone to open the door, sometimes more than once.
- Your share of the charges: paid to the building as the assembly decides.
We can handle this locally if you need us to. Our renovation oversight for owners abroad includes meeting with contractors, letting them into the property, and keeping you updated with photos so you know what’s going on.
“Before you vote, ask the engineer for a short written list of what is wrong with the facade and balconies today. Once the insulation is on, nobody will see those cracks again until they become a much bigger job. And if you live abroad, sort out your proxy and authorisation the week the meeting is called, not the day before.”
Yanis Zisis, Founder, Home Watch Athens
What decides how big the project is?
The main things that shape the scope are:
| Factor | Why it matters |
| Building height and facade area | More floors and wider facades mean more insulation, more scaffolding and a longer timetable. |
| Existing damage | Concrete and balcony repairs must be done first and can extend the works. |
| Number of flats joining | More flats adding their own works means more coordination. |
| Heating type | Replacing central oil heating or moving to autonomy is a separate project within the project. |
Your building manager can explain how they worked out your part of any extraordinary charges. They should be able to break it down for you so it’s clear how your share was calculated.
How we help with a building upgrade
We offer our members a monthly home visit by Yanis, with a photo update. We also help with building issues and renovation follow-ups, but these are extra services that we quote separately. During a building upgrade, this can mean attending meetings with your proxy and letting workers into your flat. If you would like us to look after your Athens home while the building is being worked on, Apply for Membership.
Frequently asked questions
Can I refuse to pay for thermoprosopsi?
If the general assembly approves the works with the majority your building’s regulation and Greek law require, the charges are generally binding on all owners, including those who voted against, with your share set by the building’s regulation. If you think the decision was not taken properly, remember that challenging it is a legal matter rather than a question of simply not paying.
Do I have to replace my windows if the building insulates?
No, not automatically. The shared works cover the facade, roof and common areas, and each owner decides about their own windows. If your flat joins a funded programme, though, the works planned for your flat must help reach the energy target, and new windows are often part of that. Ask the engineer what your flat needs, because old frames next to a newly insulated wall still let heat out.
Can I vote at the general assembly from abroad?
Usually yes, through a written proxy to someone you trust, such as a neighbour, a relative or a representative. Check what your building’s regulation accepts. A digital authorisation issued through gov.gr with your Taxisnet or web banking details has the same weight as a document with a certified signature, so if your building accepts it, you may not need a trip to a consulate.
Does the building need its own tax number for a funded upgrade?
Yes, in the whole-building route of the Εξοικονομώ 2021 programme the building needed a valid ΑΦΜ for its management, requested by the building manager from the tax office. Programme rules change between rounds, so check the current guide on the official Εξοικονομώ website before your assembly meets.