When it comes to flat roof waterproofing Greece has one clear lesson: it’s best to do it at the same time as the insulation, as a single job. Typically, on a building in Athens, the crew starts by removing the old layers, then repairs the slab and makes sure it slopes properly towards the drains. Next, they add insulation boards and a waterproof layer, finishing with a protective layer on top. If you do these jobs separately, the second one often ends up damaging the first.
Key takeaways
- Most leaks start at details, not in the middle of the roof: drains, upstands, the stair-head room, solar heater bases and antenna fixings.
- The dry months from late spring to early autumn are the natural window for the work in Athens.
- Ask for a written guarantee, photos of every layer before it is covered, and a flood test before the protection goes on.
- The roof is a shared part of the building, so the decision and the bill belong to all the owners.
How can you tell the roof needs the work?
The roof of an apartment building in Athens, known as the taratsa (ταράτσα), is made of concrete and has to deal with strong sun and short bursts of heavy rain. As the layers of the roof start to wear out, you can see the signs of this in two main areas.
When you’re inside the top-floor apartment, check the ceiling for any yellow or brown stains, peeling paint, or bubbles in the paint. If you notice stains near the outside walls, they point to the edges of the roof, where most water gets in. And if the apartment gets very hot in the summer and is hard to warm up in the winter, that’s a good indication that the slab doesn’t have much insulation.
On the roof itself, four things tell the story:
- Ponding: water that still stands long after the rain has stopped.
- Cracked membrane: splits along the joins between sheets, or a coating gone brittle.
- Blistering: raised bubbles, a sign of moisture trapped underneath.
- Loose edges: membrane peeling from the parapet wall, or sealant opened up around a drain.
If you notice several of these signs at the same time, it’s probably time for a whole new build-up, rather than just adding another layer on top of the old one.
What are the build-up options, in plain words?
Every flat roof has a few key parts: a slab, a sloped layer to help water run off into the drains, a layer to keep water out, some insulation, and a protective top layer. The main difference between the options is what this waterproof layer is made of and where the insulation is placed.
| Option | What it is | Where it fits |
| Sheet membranes | Rolls of bitumen-based or synthetic sheet with overlapping joins, bonded to a primed surface. This is the roof membrane Greece’s builders commonly lay. | Most apartment-building roofs. |
| Liquid coatings | A waterproof layer rolled on in several coats that cures into one seamless skin. | Roofs with many pipes, bases and awkward corners. |
| Inverted roof | The waterproof layer goes on the slab and the insulation boards sit on top, shielding the membrane from the sun. | Roofs being fully rebuilt, for the roof terrace insulation Greece’s summers call for. |
| Tiles or slabs on top | A walkable finish laid over the protected layers. | Roofs that people use. |
How an inverted roof is put together
For an inverted roof, a technical specification written for the Greek public sector lays out the order of the layers. First, a layer of concrete is shaped to slope towards the downpipes, so water can drain easily. On top of this concrete goes the waterproof layer, a membrane made of bitumen. Next, rigid insulation boards made of extruded polystyrene are placed over the membrane. Finally, a heavy layer of crushed stone is added on top to hold everything in place. The specification also mentions a geotextile, a fabric made of synthetic fibres that allows water to pass through, as one of the materials used in the build-up.
The thickness of the boards comes out of the building’s energy study.
A reflective top coat doesn’t work like insulation does. We have a guide on what reflective roof coatings and insulating paints can and cannot do.
Which details fail first?
A roof membrane usually doesn’t fail in the open areas. It tends to fail at the points where it has to bend, end, or wrap around something.
- Drains: the membrane has to run down into the outlet, not stop at its rim. A leaf guard keeps it clear longer.
- Upstands: at the parapet wall the waterproof layer turns up the wall and is fixed and capped at the top, so water cannot get behind it. The corner is rounded first, because a sharp angle cracks the sheet.
- The stair-head room: the small structure where the staircase reaches the roof has its own little roof, a door threshold and four wall bases. All need the same treatment, and it is often left out.
- Solar heater bases: frames bolted through the membrane are a classic leak. The sound way is to stand them on raised concrete pads, with the waterproof layer dressed over each pad.
- Antennas, dishes and pipes: every mast and vent pipe through the surface needs its own collar and seal. Unused fixings come off first.
This idea works on a smaller scale too, and we have an article that explains waterproofing an apartment balcony.
When can the work be done?
When it comes to laying and curing membranes and coatings, a dry surface and dry weather are essential. Athens helps here. The National Observatory of Athens has kept track of the weather for a long time, and its records show that the months from June to September are the driest. July is the driest of all, while December gets the most rain. Most of the year’s rainfall comes between October and March.
So the best time for the flat roof insulation Athens buildings need is from late spring to early autumn. If you try to do it in winter, you need a dry spell, but since the roof is open for days, the programme has to allow for covering it when it’s going to rain.
When you set up scaffolding to lift materials, you need to get a small-scale works approval. An engineer sends in the paperwork online using the Technical Chamber’s system, and it gets approved automatically when they submit it.
Who decides, and who pays?
When it comes to the roof, everyone who owns a part of the building has a say in what happens to it, and they all share the bill. We’ve put together a guide that explains how roof repair bills are divided between owners. There’s also another article that goes into detail about how the bill for insulating a shared roof is split.
What should the building ask for?
Three things belong in the written agreement before work starts.
A written guarantee. You want a guarantee in writing that spells out the details. It should name the building and describe the build-up, layer by layer. The guarantee should also say what’s included: the materials, the workmanship, or both. And it needs to state how long it lasts and who answers a claim. If it only covers materials, it leaves out the joins, which is where leaks start.
Photos of each layer. After the top layer is in place, the membrane is hidden from view. Request photos with dates of the cleaned slab, the falls, the membrane with its overlaps, all the drains and upstands, the insulation boards, and the final surface.
A flood test. They do a test to make sure everything is waterproof. First, they block the drains and fill the roof with a shallow layer of water. They mark the water level and check the ceilings on the top floor. If the water level stays the same and the ceilings stay dry, they cover everything up. But if the water level goes down or the ceilings get wet, they fix the leak right away, while the membrane is still visible.
“When I go up to a roof after a job, I do not look at the middle. I walk the edges and I look at every drain, every corner and the base of every solar heater. If the layer photos and the flood test exist, I can tell an owner abroad exactly what they have. If not, we all wait for the first big storm to find out.”
Yanis Zisis, Founder, Home Watch Athens
How do you check the roof afterwards?
After the first big rain in the autumn, and when the wet season is ending, are good times to check things out. Go up on the roof and make sure no water is still sitting there after the rain has stopped. Also, check that the drains are clear and that the edges and seals are intact. Then, go inside and take a look at the ceilings on the top floor.
One of the biggest threats to a good roof is the work that’s done later on. For instance, if you install a new antenna or replace your solar heater, it can puncture the layers of your roof in an afternoon. When it comes to making additions, nothing is ever fixed directly through the roof itself. Instead, new things are either placed on a pad or attached to a wall.
Keep the guarantee, the photos of the layers and the record of the flood test with the building’s documents.
How Home Watch Athens helps
We keep an eye on building matters like this for our members as part of our member services. If you own a home but live abroad, our renovation oversight for owners abroad covers work that’s being done inside your home. Yanis does a monthly home visit and takes a look at the ceilings of top-floor apartments. He sends a photo update, so anything new, like a mark on the ceiling, is caught early. If you want this kind of service for your home, Apply for Membership.
Frequently asked questions
Should a flat roof be insulated and waterproofed at the same time?
Yes. The two jobs share the same preparation: stripping the old layers, repairing the slab and forming the falls to the drains. Done together, the layers are laid as one build-up, tested once and covered once. Done separately, the second job cuts through the first.
Can a new coating simply go over the old membrane?
Only when the old membrane is dry, well bonded and has no blisters, and only as a way to extend its life. Over trapped moisture it will blister again, and it adds no insulation. With ceiling stains, ponding and cracked joins together, the roof needs stripping to the slab.
What is the best time of year for taratsa waterproofing in Athens?
Late spring to early autumn. Membranes and coatings need a dry surface and dry weather to bond and cure, and the long-term records of the National Observatory of Athens show June to September as the driest months. Winter work is possible only in a dry spell.
Why do solar water heaters cause roof leaks?
Because their frames are often bolted straight through the waterproof layer, and each bolt hole is a path for water. The sound method is to stand each frame on a raised concrete pad, with the membrane turned up and over the pad.