To compare renovation quotes in Greece, have each contractor work from the same written scope, then go through each quote line by line, not just the total. A good quote shows quantities, named materials or allowances, labour, whether 24% Greek Tax is included, what is excluded, who removes the rubble and how extra work will be priced. Often, the lowest total is simply the one that leaves out the most.

Key takeaways

  • Give every contractor the same written scope, so you are comparing prices for one job, not three different jobs.
  • An itemised quote lists quantities (m², metres, points, pieces) and names materials or a clear allowance for each.
  • Check whether each figure includes 24% Greek Tax; quotes in Greece often show the price before Tax.
  • Read the exclusions and waste removal lines as carefully as the prices.
  • Agree in writing how variations are priced and approved before any work starts.

Why the lowest renovation quote is rarely the cheapest

Owners abroad get renovation quotes in all sorts of shapes: a single number on WhatsApp, a simple list in Greek, occasionally a detailed spreadsheet. Putting the totals side by side feels like a comparison, but it rarely is.

A short quote is not necessarily dishonest. A quick visit rarely gives the full picture, and the gaps appear later as “extras”. This is common in Greece, where contractor quotes often end up higher than first quoted. As a guide, renovation works start from €600/m² (excluding 24% Greek Tax), and our article on what an apartment renovation costs in Greece breaks down where budgets go. This guide covers the step before that: making sure your quotes are for the same job.

How to compare renovation quotes in Greece on the same basis

The most helpful thing you can do is write the scope before anyone prices it. Go through each room and note what is being removed, what is new and what stays. Include the details: whether the electrics and plumbing are being fully replaced or only partly, which floors, doors and windows are changing, and who will supply the tiles, sanitaryware and kitchen.

Send the document to each contractor and have them price everything in the same order, one line at a time. Also, ask them to point out anything they think is missing, instead of just leaving it out without saying anything. Our guide on how to choose a renovation contractor in Athens helps with the shortlist.

When you’re making bigger changes, such as moving walls or the bathroom, you might need to get an engineer involved. Our guide on whether you need a permit to renovate in Greece lays out the different routes. If an engineer’s fee or approval is needed, check which quote covers it.

What an itemised renovation quote in Athens should show

An itemised renovation quote in Athens doesn’t need to be long, but each line should tell you three things: how much it costs, what exactly you’re getting, and who is supplying it.

Quantities

Pay attention to the units. Check the square metres of tiling and plastering, the metres of skirting, the number of electrical points, sockets and lights, and the number of internal doors. If one quote says 30 m² of wall tiles and another says 18 m², they have measured your bathroom differently, and one of them has got it wrong.

Materials and allowances

Finishes should either be named, with a brand, range or size, or have a stated allowance per m² or per item. Saying “tiles included” doesn’t really mean much. If you’re choosing your finishes later, an allowance gives you a clear idea of what’s already covered and what you’ll pay on top.

Labour and supply

Quotes in Greece usually separate labour (εργασία) from materials (υλικά). Sometimes a line covers labour only, because you or a supplier are providing the item. That’s fine, as long as it is clearly stated. Be careful with kitchens, sanitaryware and air conditioning units, which are often quoted as “installation only”.

Is 24% Greek Tax included in each quote?

One big reason quotes seem further apart than they really are is Tax. The standard rate of Greek Tax is 24%, as listed on the tax authority’s page of standard Greek Tax rates. Many contractors quote the price before Tax, sometimes marked “+ΦΠΑ”. Others don’t mention it at all.

Ask each contractor for three figures: the price before Tax, the Tax amount and the total payable. If someone offers a lower price “without paperwork”, treat it as a warning, not a saving. You lose proper invoices, warranties and any record of what you paid. Our guide to paying contractors in Greece from abroad explains invoices and payment stages in detail.

Renovation quote exclusions and waste removal

Exclusions are where budgets are won or lost, so read them as closely as the prices. Common renovation quote exclusions in Athens include:

  • Rubble removal, the skip and disposal
  • Protection of the stairwell, lift and common areas
  • Engineer’s fees, approvals and related paperwork
  • Electrical testing and the installer’s declaration
  • Repairs to hidden damage found once walls or floors are opened
  • Final cleaning, and removal of old furniture or appliances

Waste removal deserves its own line. In a polykatoikia, the rubble is usually carried down the stairs or taken down in the lift in bags, then put into a skip or loaded into a van. The quote should say who does this, how often, and where the waste goes. Ask whether the price includes proper disposal at a facility that is authorised to handle it, and whether you’ll get a receipt. For bigger projects, your engineer can tell you whether any formal waste paperwork is needed.

Every new or altered electrical installation has to be inspected by a qualified electrician, who records the results in an installer’s declaration (ΥΔΕ), as the electricity distribution operator’s safety guidance explains. Make sure the quote says who provides it.

Variations: how will extra work be priced?

Older Athens apartments almost always reveal surprises once work begins, such as corroded pipes or outdated wiring. There’s no way to avoid this, but you can agree in advance how it will be handled. A good quote includes:

  • A rule that no extra work starts without your written approval, with photos and a price
  • Day rates or unit rates for common extras, so they are not priced from scratch
  • A clear statement of what the contingency covers, if one is included

Keep your own contingency on top of the quote. Changes agreed over the phone are the fastest way for a budget to drift.

A worked comparison: three quotes for one apartment

The example below is illustrative, not a real job. Imagine a two-bedroom flat of about 75 m² in a central Athens polykatoikia, built in the 1980s, with one bathroom. It is being renovated with a new kitchen, a full rewire and new floors. Three contractors price the same scope. Quote A is the cheapest and Quote C the most expensive.

Item Quote A Quote B Quote C
Quantities shown No, lump sums per room Yes Yes
Bathroom tiles “Included”, no type Allowance per m² Named porcelain range
Full rewire and ΥΔΕ Rewire only Rewire and ΥΔΕ Rewire and ΥΔΕ
Kitchen Installation only Installation only Supply and installation
Rubble removal and skip Not mentioned Included Included, with receipt
Common areas protected Not mentioned Excluded Included
24% Greek Tax Not stated Excluded, shown separately Included
Extras “By agreement” Day rates listed Unit rates and written approval

Take a closer look and Quote A is not the best deal after all. It hasn’t properly priced the tiles, the electrical paperwork, the waste or the Tax, and its extras are open-ended. Quote B and Quote C are actually quite close once you add Tax to B and take the kitchen units out of C. The real choice is between B and C.

“Before comparing totals, I rewrite every quote into the same table, line by line, in English. Gaps show up immediately: no rubble removal here, no Tax there, tiles with no name. Then I go back to each contractor with the same questions, and the prices usually move closer together.”
– Yanis Zisis, Founder of Home Watch Athens

How Home Watch Athens can help

We are a trusted person on the ground for owners who live abroad. With our renovation oversight service, Yanis walks your home with each contractor before they quote, then helps you compare the quotes line by line. Once you’ve chosen a contractor, he checks the work against what was agreed. If you’d rather have one point of responsibility, we can also carry out the renovation ourselves, with an itemised quote you approve before anything starts. To get started, Apply for Membership. Yanis replies to every application within 24 hours.

Frequently asked questions

How many renovation quotes should I get in Greece?

Three is a sensible number for most apartment renovations. Fewer gives you little to compare against, and many more takes weeks and makes contractors less willing to price carefully. What matters more than the number is that every contractor prices the same written scope, so the quotes can genuinely be compared line by line.

Should a renovation quote in Greece include 24% Greek Tax?

It can be shown either way, but it must be clear. Many contractors quote the price before Tax and add it on the invoice. Ask every contractor to state the price before Tax, the Tax amount and the total payable, so you compare like with like and know exactly what each stage will cost.

What is a renovation quote checklist?

It is a short list you use to check each quote before comparing totals. Ours covers quantities, named materials or allowances, labour and supply, Tax treatment, exclusions, rubble removal, protection of common areas, electrical paperwork, how extras are approved and priced, the programme and the payment stages. Anything missing goes back to the contractor as a question.

Is a quote in Greek acceptable if I don’t read Greek?

A Greek quote is normal and can be perfectly good. The risk is not the language but missing a line, such as an exclusion or a “labour only” note. Have someone you trust translate it line by line, or ask the contractor for an English version, and make sure the signed contract states which version applies.

Can the price change after I accept a quote?

It can, if the scope changes or hidden problems are found once work begins. That is why the quote should explain how variations are handled: written approval before any extra work, with photos and a price, and agreed rates for common extras. Without this, you are negotiating each extra from abroad, after the work is already done.