AC pre-installation in a renovation (προεγκατάσταση κλιματιστικού) means putting in the necessary lines, like the insulated copper refrigerant lines, the drain for condensation, and the power and signal cables, plus the wall boxes, while the walls and ceiling are still open. Doing it this way makes it easier to fit the units later on, without having to damage the new plaster. To get ac pre-installation renovation work right, decide early where the units will go. Keep the pipes as short as possible, make sure the drain runs to a proper waste point, and record where everything is before the walls are closed up.

Key takeaways

  • Pre-installation happens at first fix, alongside the plumbing and electrics, not after painting.
  • Fix indoor unit positions before the furniture, lighting and false ceiling plans are signed off.
  • Wall splits, multi-split systems and ducted units need very different space, access and drainage.
  • Every hidden line should be pressure tested, photographed, measured and labelled before plastering.

What does AC pre-installation actually include?

For each indoor unit, the installer runs:

  • Refrigerant lines: two insulated copper pipes, sized for the planned unit, to the outdoor position, with the ends sealed.
  • Condensate drain: carries the water produced when cooling to a trapped connection on the waste system, not onto a balcony below.
  • Power and signal cable: between the units, plus a supply from the panel, usually on its own circuit.
  • Wall boxes: recessed boxes so the indoor unit sits flat with nothing visible.

When it comes to electrical work, you need a licensed electrician (αδειούχος ηλεκτρολόγος εγκαταστάτης). In Greece, that is the person who signs and stamps the installer’s declaration (ΥΔΕ), which HEDNO checks, so ask whether your renovation needs a new one. For the refrigerant side, you’ll need a qualified air conditioning technician. This is because of EU F-gas rules, which require technicians to have a certificate to work on stationary air conditioning and heat pumps. The European Commission’s summary of the technician certification rules explains how the scheme works. Ask your contractor who will be handling each part of the job.

Wall split, multi-split or ducted unit: which suits your apartment?

Settle this before first fix. Choosing between air conditioning and other ways to heat your home is a separate decision; this post assumes you have picked air conditioning.

Wall split (one indoor, one outdoor)Multi-split (several indoor, one outdoor)Ducted unit in a false ceiling (καναλάτο)
Space neededWall space above head height in each roomSame indoor space, but only one outdoor unitA dropped ceiling, usually over a corridor or bathroom, with room for ducts and grilles
Pipe runsShort, one set per roomSeveral sets meeting at one outdoor unit, so runs are longerOne set to the ducted unit, then air ducts to each room
AccessUnit is reachable on the wallUnits reachable; check access to the outdoor unitNeeds a proper access hatch for filters, drain and servicing
Noise and lookVisible unit in each roomVisible units, fewer outdoor unitsOnly grilles visible; quiet if ducts are well sized

In Athens, a multi-split apartment setup works well when there is only one good spot outside for the outdoor unit, even though the pipes have to be longer. If you are already planning to lower the ceilings, ducted air conditioning in an apartment in Greece is worth considering, as long as there’s enough space for the system and a technician can easily access it to maintain the filter and drain. It’s also a good time to think about ceiling lighting, so you can avoid any problems with spotlights, ducts, and hatches getting in the way of each other.

When comparing models, start with the EU energy label. It gives you an idea of how efficient the model is and how much noise it makes, both inside and outside. The European Commission’s air conditioner product page links to the EPREL database, which has more detailed information about each model, like the type of refrigerant used. It also helps to know the capacity of the model before first fix, so the installer can make sure the pipes are the right size.

Choosing indoor unit positions before the walls close

Before anyone chases walls, walk each room with the plans and decide:

  • Where the bed, sofa and desk go, so air does not blow onto anyone.
  • Where wardrobes and curtains sit, so nothing blocks the unit.
  • Where lights and cornices are, so nothing clashes.
  • Which wall gives the shortest route outside, with the drain falling all the way.

Mark each spot with a pencil and take a picture of it. Once the furniture and lighting plans are fixed, treat those positions as fixed too.

Where can the outdoor unit go, and why does pipe length matter?

When it comes to putting the outdoor unit in place, you need to check the building’s rules and Greek laws to see where it’s allowed. Our guide to the rules on outdoor unit position and building permission for AC in Greece covers this in full. Before you start installing, figure out where the outdoor unit will go, and then try to run the pipes in the most direct way possible. If the pipes are too long or have too many bends, it can make the system work harder, and manufacturers set limits on pipe length and height difference, so ask the technician to confirm the planned runs fit.

On the Riviera, salt air is hard on outdoor units and exposed pipework. Our post on materials that stand up to sea air on a Riviera home covers what holds up best.

The condensate drain inside the wall

The condensate drain inside the wall is often not done right, because you cannot see it once it is plastered over. To do it correctly, the drain needs to slope downwards steadily, with no low spots, and have a trap to stop bad smells from coming back up. If gravity can’t be used for drainage, a small pump is usually installed to help move the condensate, and it has its own access point for maintenance.

Plan the drain together with your plumber. If you are already replacing the supply and waste pipes in an older Athens flat, add the connections for the condensate to the plans too. And if you are also fixing weak water pressure in the apartment, it makes sense to look at both issues at the same time, since the walls will already be open anyway.

Pressure test, photos and labelling before plastering

This is what makes pre-installation useful to a future installer:

  1. Pressure test the copper lines and get the result in writing.
  2. Seal the pipe ends so dust and moisture stay out until the units arrive.
  3. Photograph every run with a tape measure in shot.
  4. Label both ends of each pipe pair, drain and cable with the room name.
  5. Keep one folder with photos, test result, sizing notes and the electrician’s paperwork.

“Decide where every indoor unit goes before anyone picks up a chasing tool, and put a pencil mark on the wall. Then insist on a pressure test and photos with a tape measure in shot before plastering. The day a new installer comes to fit the units, that folder saves you from opening walls you have just painted.”

Yanis Zisis, Founder, Home Watch Athens

Keeping an eye on the works from abroad

When you manage a renovation from abroad, pre-installation work is hidden behind plaster within a few days. Our renovation management service for Athens homes helps at exactly that moment. We coordinate the contractors and send you photo updates so that key elements like routes, drains, and labels are properly documented before they’re gone. As a member, you get a monthly home visit from Yanis with a photo update, and renovation and other member services are quoted separately.

If you are getting ready to renovate and need someone local to help, Apply for Membership.

Frequently asked questions

What is προεγκατάσταση κλιματιστικού?

Προεγκατάσταση κλιματιστικού is the Greek term for AC pre-installation: running the insulated copper refrigerant lines, the condensate drain, the power and signal cable and the wall boxes during a renovation, before the walls and ceilings are closed. The indoor and outdoor units are fitted later, connecting to lines that are already hidden. It avoids chasing finished walls and keeps the installation neat.

When should AC pre-installation happen during a renovation?

It should happen at first fix, at the same stage as the new plumbing and electrical runs, while walls and ceilings are still open. The indoor unit positions and the outdoor unit position need to be agreed before this stage, and the lines should be pressure tested, photographed and labelled before any plastering or false ceiling boards go up.

Is a ducted unit (καναλάτο κλιματιστικό) a good choice for an apartment?

A ducted unit can work very well in an apartment when you are already installing a false ceiling, usually above a corridor or bathroom. Only the grilles are visible and it can be very quiet. It needs enough ceiling depth for the unit and ducts, a reliable condensate drain and a proper access hatch for filter cleaning and servicing.

Where should the condensate drain from an air conditioner go?

Ideally into the apartment’s waste system through a trapped connection, so the water drains away out of sight and drain smells cannot come back into the room. The pipe needs a steady fall all the way, with no dips. Where gravity drainage is not possible, a small condensate pump is fitted, and it should remain accessible for maintenance.

What records should I keep after AC pre-installation?

Keep photos of every pipe and cable run with a tape measure in shot, the written pressure test result, a note of the unit capacities the lines were sized for, labels at both ends of each line and the electrician’s paperwork. Together they let any future installer connect the units confidently and stop anyone drilling into a hidden pipe.